AGENDA ITEM: Appeal of Condition No. 43 of Planning Commission Approved
Conditional Use Permit, CUP P-2005019 and Administrative Use Permit, AUP P-
2005018 that Allows the Establishment of a Private School with Tandem Parking
at 3939 Landmark Street in the Light Manufacturing (M-1) Zone
Contact Person/Dept.: Jose Mendivil Phone Number: (310) 253-5757
Fiscal Impact: Yes [X] No [] General Fund: Yes [X] No []
Public Hearing: [X] Action Item: [] Attachments: [X]
Public Notification: Notices were mailed on October 24, 2005, to all property owners and
occupants within a 300 foot radius of the site, extended to end of city block; courtesy
notices were mailed on October 24, 2005, to the City Council, Planning Commission,
Cultural Affairs Commission, Culver City Homeowners Association, Culver City
Chamber of Commerce, CAO, and Department Heads; Master Notification List e-mailed
by the CAO's office on 11/10/05.
Department Approval:
Susan Evans, 11/2/05
CAO Approval:
Jerry Fulwood 11/9/05
City Controller Approval:
Marlee Chang 11/9/05
RECOMMENDATION:
That the City Council uphold Planning staff’s recommended amendment to Condition
No. 43 of the Planning Commission approved Conditional Use Permit, CUP P-
2005019 and Administrative Use Permit, AUP P-2005018 that allows the
establishment of a private school with tandem parking at 3939 Landmark Street in
the Light Manufacturing (M-1) Zone (Draft City Council Resolution – Attachment No.
7).
BACKGROUND:
On June 8, 2005, the Planning Commission opened the public hearing for a
Conditional Use Permit and Administrative Use Permit request to allow a private
school to operate at 3939 Landmark Street (June 8, 2005, Planning Commission
Staff Report – Attachment No. 11). Due to the California Environmental Quality Act
(CEQA) mandated public review period, the Commission could not act on the project
that evening and after hearing public testimony, continued the hearing to July 13,
2005 (July 13, 2005, Planning Commission Staff Report – Attachment No. 11). On
July 13, 2005, the Commission approved the project; in conjunction with that
approval and pursuant to CEQA guidelines, the Commission adopted a Mitigated
Negative Declaration (MND) after finding that the proposed project will require
mitigation measures to reduce certain impacts on the environment (MND –
Attachment No. 6).
17 City of Culver City, California
City Council Agenda Item Report
18
One of the mitigation measures requires the installation of a traffic signal at the
intersection of Washington Boulevard and Landmark Street. At the July 13
th
Commission meeting, the Commissioners expressed concern that a westbound left
turn pocket on Washington Boulevard should be required in addition to the traffic
signal. They stated that idle vehicles waiting to turn left onto Landmark Street would
create congestion and potential hazards for west bound through traffic along
Washington Boulevard. The project’s traffic study (Attachment No. 9) and the City’s
Traffic Engineer concurred that a left turn pocket was not necessary to mitigate
potential impacts created by the project. However, the City’s Traffic Engineer did
state that such a roadway feature would be helpful with traffic flow.
The Commission then discussed the necessity to eliminate a parking lane if a left
turn pocket is installed. Staff informed the Commission that Howard Industries on
the north side of Washington Boulevard had expressed concern over potential
elimination of the parking lane adjacent to their property. They stated that they use
the westbound parking lane as a queuing lane for delivery trucks waiting to enter
their site. Howard Industries reported that main usage of the parking lane for
queuing occurs from about 6 AM to 3 PM. Commissioners asked if the eastbound,
south parking lane could be eliminated, especially since the auto dealership sites
adjacent to the eastbound parking lane (and at the intersection with Landmark
Street) are vacant. Staff responded that the south (or eastbound) parking lane could
be eliminated just as well the north (or westbound) parking lane, in order to
accommodate the left turn pocket. The Commission voted to approve the project
with an amendment to Condition No. 43 (which requires the traffic signal) adding a
requirement for a left turn pocket.
Following the Planning Commission meeting, Brentwood Capital, owner and
developer of the vacant auto dealerships on the south side of Washington
Boulevard, told staff that in order for their future development to be successful, they
would need the parking lane. They have expressed an interest in potential
construction of a mixed use project that would include street level commercial/retail
space and upper level residential units. Staff initiated discussions between the
Applicant, Brentwood Capital, and Howard Industries to see if there could be a
resolution that all parties would accept. Staff then returned to the Planning
Commission on August 10, 2005, to seek clarification on which parking lane should
be eliminated (August 10, 2005, Memo - Attachment No. 12).
Originally, staff was going to recommend that the Commission state clearly that the
south side parking lane be taken out. Due to ongoing discussions with all parties
involved, staff recommended on August 10
th
that the Planning Commission clarify
Condition No. 43 such that they direct staff to work with all parties involved in
minimizing impacts resulting from the installation of the left turn pocket and not City of Culver City, California
City Council Agenda Item Report
19
designate elimination of parking on one side or the other. The Planning Commission
agreed with staff and Condition No. 43 of Planning Commission Resolution No.
2005-P013 (Attachment No .10) is worded to reflect this clarification.
Subsequent discussions with the Applicant, Appellant (Howard Industries), and
Brentwood Capital did not lead to a definitive resolution or decision as to which
parking lane would be eliminated. On September 12, 2005, Howard Industries
submitted an appeal (Attachment No. 13). They did not appeal the project as a
whole and did not wish to see a reversal of the Planning Commission approval. The
appeal is related to Condition No. 43, specifically the potential for the elimination of
the north parking lane to make room for the Planning Commission required left turn
pocket.
DISCUSSION:
After submittal of the appeal, staff continued discussions with the Applicant and
Appellant to see if a compromise could be reached satisfying both parties and the
City. Resulting from these discussions was a letter, jointly signed by the Applicant
and the Appellant, and submitted to the City on November 1, 2005 (Attachment No.
14). The letter contains proposed amended language for Condition No. 43 that
requires the Applicant to post a bond with the City to cover the cost of installation of
the left turn pocket. The amended condition also requires the applicant to prepare a
study on the necessity of the left turn pocket within 12 months of the school’s
opening and to recommend a lane configuration if the study determines that the left
turn pocket is required. The 12 month delay is required so that the Applicant can
monitor traffic flows created by the school over time.
The bond would be returned to the applicant if no such left turn lane is deemed
necessary by the City within four years following final approval of the Project (the
date the City Council votes on the appeal). The reason for the four year limit is that
within this time frame, several developments (such as Brentwood Capital’s proposal,
Turning Point School Expansion, and the Specific Plan for the area) are expected to
commence with entitlements and/or City approvals. It is anticipated that given the
cumulative traffic impacts for all these projects, including Park Century School, a left
turn pocket will be required to mitigate traffic impacts.
Further, during this time frame, the Appellant and Applicant hope that a final lane
configuration is approved for the left turn pocket, assuming a left turn pocket is
required. This could mean some street dedication, a narrowing of the sidewalks, or
a combination of the two. Because no entitlement requests (other than Park Century
School and Turing Point) are currently in the system, it cannot be determined at this
time which side of the street should be modified in order to accommodate the left City of Culver City, California
City Council Agenda Item Report
20
turn pocket, should it be needed. There are unknown variables. The bond and
study are required to ensure that the school is able to open, even if the left turn
pocket has not been installed, while still maintaining responsibility for the left turn
pocket installation, should it be needed.
Both parties agree with this revised condition; staff believes that the spirit of the
Planning Commission’s intent and sufficient protection for the City are achieved
through this proposed amended language.
ENVIRONMENTAL DETERMINATION
Pursuant to CEQA guidelines this project has been determined to have less than
significant impacts on the community provided certain mitigations are incorporated; a
Mitigated Negative Declaration (MND) was adopted by the Planning Commission on
July 13, 2005. Specifically, the increased number of vehicle trips for the school and
the exposure of persons to noise levels in excess of standards established in the
General Plan were identified as potentially significant unless mitigated. Several
mitigations have been proposed as conditions of approval; Attachment No. 6
identifies the specific mitigation measures.
The left turn pocket was not a required mitigation and was a revision to the
Conditions of Approval as a whole, and not to the MND. Further revision pertaining
to the left turn pocket as recommended by staff, will not affect the already adopted
MND.
FISCAL ANALYSIS:
As an industrial use, the site generates property taxes for the City, the
Redevelopment Agency, and other non-city agencies. Normally, this revenue
source would be eliminated because the applicant, Park Century School, is a not-for-
profit entity. However, the applicant agreed to pay annually, the property taxes that
would normally be generated for the City and the Redevelopment Agency had an
industrial use continued on the site. The applicant has agreed to pay property taxes
due to the City and the Redevelopment Agency; this condition is included in
Planning Commission approved Resolution No. 2005-P013 (Attachment No. 10) as
Condition No. 48. City of Culver City, California
City Council Agenda Item Report
21
CONCLUSION
The Planning Commission, after discussing both traffic and fiscal impacts (the non-
profit status of the Applicant) approved the project. They felt that with all mitigations,
the inclusion of a left turn pocket, and the acceptance by the school to pay the
property tax, the project would, overall, be a benefit to the City. The Appellant did
not disagree with the merits of having a school locate on the project site and was not
opposed to the project. Staff believes the contents in the joint letter agreement will
achieve an acceptable outcome for all parties.
ATTACHMENTS:
1. Project Summary
2. Area Map
3. Aerial Photo of Area
4. General Plan Land Use Designation Map
5. Photographs of Existing Building and Proposed Art.
6. Mitigated Negative Declaration
7. Draft City Council Resolution No. 2005-R
8. Letter to Sean T. Matsler, Esq. from Geomatrix Consultants, Inc., received March
10, 2005
9. Traffic Study for the Park Century School – Revised April 27, 2005
10. Approved Planning Commission Resolution No. 2005-P013
11. June 8, 2005, and July 13, 2005, Planning Commission Staff Reports without
Attachments
12. August 10, 2005, Planning Commission Memo without Attachments
13. September 12, 2005, Howard Industries Appeal Letter
14. November 1, 2005, Joint Parties Letter with Proposed Amended Language
15. Plans dated April 27, 2005 (Date received)
MOTION:
That the City Council:
Adopt Resolution No. 2005-R__that amends Condition No. 43 of Planning
Commission approved Resolution No. 2005-P013, addressing the installation of a
left turn pocket.
OR,
City of Culver City, California
City Council Agenda Item Report
22
Uphold the original Planning Commission approved Resolution No. 2005-P013, with
no modifications.
11/14/05
Appeal of Condition No 43 of Planning Commission Approved
Conditional Use Permit, CUP P-2005019 and Administrative Use
Permit, AUP P-2005018 that Allows the Establishment of a Private
School with Tandem Parking at 3939 Landmark Street in the Light
Manufacturing (M-1) Zone
MEETING DATE
AGENDA ITEM
ATTACHMENTS
Pages|109| Project Summary 1-2
2 Area Map 3|109| Aerial Photo of Area 4
4 General Plan Land Use Designation Map 5|109| Photographs of Existing Building and Proposed Art 6-7|109| Mitigated Negative Declaration 8-23|109| Draft City Council Resolution No 2005-R 24-27|109| Geomatnx Consultants, Inc , Letter Received March 10, 2005 28-41|10 9| Traffic Study — Revised Apnl 27, 2005 42-181
10 Approved Planning Commission Resolution No 2005-P013 182-190
11 June 8, 2005, & July 13, 2005, Planning Commission Staff Reports 191-201
without Attachments
12 August 10, 2005, Planning Commission Memo without Attachments 202-203
13 September 12, 2005, Howard Industries Appeal Letter 204-206
14 November 1, 2005, Joint Parties Letter with 207-208
Proposed Amended Language
15 Plans dated Apnl 27, 2005 (Date received)Attachment 1
PROJECT SUMMARY
APPLICATION TITLE & CASE NO
Conditional Use Permit, CUP P-2005019 and Administrative Use Permit, AUP P-2005018 to Allow
the Establishment of a Private School with Tandem Parking at 3939 Landmark Street in the Light
Manufacturing (M-1) Zone
PROJECT ADDRESS/LOCATIQN:
3939 Landmark Street
(Near Intersection of Landmark Street
and Washington Boulevard)
APP4ICANT I N FORMAI-KM
Park Century School Contact Person Sean Matsler
2040 Stoner Avenue Latham & Watkins LLP
Los Angeles CA 90025 633 W Fifth Street, #400
(310) 478-5065 Los Angeles CA 90071 [(213) 891-8685]
FTE,RIVICETAR1?-MATION TYPE:
Z Administrative Use Permit
Conditional Use Permit
El Administrative Site Plan Review
D Site Plan Review
0 Administrative Variance
El Variance
D Master Sign Program
El
Certificate of Appropriateness
El Certificate of Exemption
El
DOBI
El
Tentative Parcel Map
0 Tentative Tract Map
0 Lot Line Adjustment
El Zoning Code Amendment - Text
El
Zoning Code Amendment -Map
0 General Plan Amendment - Text
El General Plan Amendment - Map
0 Planned Unit Development
El Specific Plan
0 Other
'APPROVAltBODY: ublic Hearing Public Meeting EAdminis rative
Agency
El
Administrative El Redevelopment
D Other ii Planning Commission
El
City Council
CEQA
Determination
ignimo DETERMINATION AND NOTICING:
El Categorical Exemption, Class
El
Negative Declaration or .1 Mitigated Negative Declaration
Type
El
Environmental Impact Report
CEQA Noticing
El
Notice of Exemption (w/in 5 days of decision)
days prior to
5 days of decision)
Exemption
Notice of
decision)
(w/in 5 days of decision)
' Notice of Intent to Adopt (21
' Notice of Determination (w/in
• Fish & Game Certificate of Fee
El
Notice of Preparation Availabilit • Notice of Completeness
PUBLIC NOTIFICATION
Mailing
Date 05/18/05
gial
Occupants
J w/in 300' foot radius A. Property Owners
0 Occupants w/in 300 foot radius / Extended
Adjacent Property Owners &
El
Other
Posting
Date N/A
El Onsite Offsite El Other
Publication
Date N/A
El Culver City News El Other
Courtesy
Date 05/18/05
• City Council
El
Press Release
' Commissions .k. HOA /Neighborhood Groups
' Master Notification List r Culver City Organizations Cultural Affairs
El
Culver City Website
El
Cable Crawler
Commission Chamber
I4 Other Culver City Observer CCUSD
interested parties, etc
Project Summary— Attachment 1 Updated 06/02/2005 Page 1 of 2APPLICATIOMTITLE & CASE NO.
Conditional Use Permit, CUP P-2005019 and Administrative Use Permit, AUP P-2005018 to Allow
the Establishment of a Private School with Tandem Parking at 3939 Landmark Street in the Light
Manufacturing (M-1) Zone
PROJECVADDRESS/LOC TION: APPLICANTEINFORMATION:
Park Century School
2040 Stoner Avenue
Los Angeles CA 90025
(310) 478-5065
Contact Person Sean Matsler
Latham & Watkins LLP
633 W Fifth Street, #400
Los Angeles CA 90071 [(213) 891-8685]
3939 Landmark Street
(Near Intersection of Landmark Street
and Washington Boulevard)
iPER,MITi4PRLICATION T*TIE:
1E1 Administrative Use Permit
Conditional Use Permit
El Administrative Site Plan Review
O Site Plan Review
El Administrative Variance
O Variance
O Master Sign Program
O Certificate of Appropriateness
0 Certificate of Exemption
El
DOBI
0 Tentative Parcel Map
0 Tentative Tract Map
0 Lot Line Adjustment
O Zoning Code Amendment - Text
El
Zoning Code Amendment -Map
0 General Plan Amendment - Text
O General Plan Amendment - Map
CI Planned Unit Development
El Specific Plan
O Other
ApPRoVg. BODY: pi thir6ea 1 n 1 Ou L._E :,ftcW . g . Ieetrn -Administrative
0 Administrative 0 Redevelopment Agency
Z Planning Commission 0 Other
0 City Council
ENVIRONMENTAL DETERMINATION AND NOTICING
Attachment 1
PROJECT SUMMARY
CEQA
Determination
_,
El
Categorical Exemption, Class
El
Negative Declaration or n Mitigated Negative Declaration
El
Environmental Impact Report, Type
CEQA Noticing
El
Notice of Exemption (w/in 5 days of decision)
4, Notice of Intent to Adopt (21 days prior to decision)
I Notice of Determination (w/in 5 days of decision)
Fish & Game Certificate of Fee Exemption (w/in 5 days of decision)
El
Notice of Preparation • Notice of Availabilit El
Notice of Com • leteness
PUBLIC NOTIFICATION
Mailing
Date 05/18/05
El w/in 300 foot radius
w/in 300 foot radius / Extended
El
Other
fa Property Owners
' Occupants
El
Adjacent Property Owners & Occupants
Posting
Date N/A
El
Onsite El
Offsite El Other
Publication
Date N/A
El
Culver City News El Other
Courtesy
Date 05/18/05
ii City Council • Press Release
i Commissions n HOA /Neighborhood Groups
Master Notification List 6. Culver City Organizations Cultural Affairs
El
Culver City Website
El
Cable Crawler
Commission Chamber
ii Other Culver City Observer CCUSD
interested parties etc
Updated 06/02/2005
Page 1 of 2
Project Summary - Attachment 10 0 08 0 08 016 Miles
Area Map
Attachment No 2
(NI
CUP
P-2005019
&
AUP
P-2005018
Century Park
School
3939
Landmark
Street
Parks
Parcels
4 I • • City Boundary
40 08
0 08
016 Miles
Aerial Map
Attachment No 3|1010|CUP
P-2005019
&
AUP
P-2005018
Century Park
School
3939
Landmark
StreetAttachment No 5
PHOTOGRAPHS OF EXISTING BUILDINGPLANNING DIVISION
Attachment 6
(310) 253 5710
FAX (310) 253 5721|1010|9770 CULVER BOULEVARD CULVER CITY CALIFORNIA 90232 0507
INITIAL STUDY
ENVIRONMENTAL CHECKLIST FORM AND ENVIRONMENTAL DETERMINATION
Project Title Conditional Use Permit CUP P-2005019 and Administrative Use Permit AUP P-
2005018 for Park Century School
Lead Agency Name & Address City of Culver City Planning Division
9770 Culver Blvd Culver City, CA 90232
Contact Person & Phone No Jose Mendivil Associate Planner
(310) 253-5757
Project Location/Address 3939 Landmark Street
Culver City
Nearest Cross Street Washington Boulevard APN 4206-013-012
Project Sponsor's Name & Applicant Contact Person
Address Park Century School Sean Matsler
2040 Stoner Avenue Latham & Watkins LLP
Los Angeles CA 90025 633 West Fifth Street Suite 4000
(310) 478-5065 Los Angeles California 90071
(213 891-8685
General Plan Designation Industrial & General Zoning Light Manufacturing (M-1)
Corridor
Redevelopment Project Area Component Area No 3
Overlay Zone/Special District N/A
Project Description and Requested Action Proposed conversion of a 37 000 square foot
industrial building (currently used for printing and woodworking) into an elementary school for
children with learning disabilities ages seven through 14 In addition, the applicant proposes to
use blocked access parking (tandem parking) to meet some of its required onsite parking The
school would have a maximum enrollment of 120 students and 47 staff This project requires a
CUP for the school use and an AUP for the tandem parking
Existing Conditions of the Project Site
The site is fully developed with a 37 000 square foot industrial building with approximately 64
surface parking spaces and 100 to 150 employees On site activities include printing and
woodworking Existing uses of toxic solvents include resin and paint thinner no material changes
or building expansion are proposed (except for a street facing art façade)
Surrounding Land Uses and Setting (Directions are reflective of Project North which
assumes Washington Boulevard to run in an East/West orientation and Landmark Street to
run in a North/South orientation)
West Single Story Office and Food Commissary Building Single Story Duplex (residential)
East Two Story Auto Dealership Service Garage
North Single Story Auto Dealership, Single Story Book Bindery Building
South Single Story Commercial Rubber Supply Building
Other public agencies whose approval is required (e g permits financing approval or participation
agreement)
N/A
92
Form Updated 3/16/04CUP P 2005019 & AUP P-2005018 Park Century School
May 18 2005
ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED
The environmental factors checked below would be potentially affected by this project involving at least
one impact that is a Potentially Significant Impact as indicated by the checklist on the following pages
El Aesthetics 0 Mineral Resources
Ej Agriculture Resources 0 Noise
0 Air Quality 0 Population / Housing
0 Biological Resources 0 Public Services
0 Cultural Resources 0 Recreation
0 Geology /Soils 0 Transportation/Traffic
0 Hazards & Hazardous Materials 0 Utilities / Service Systems
Ej Hydrology / Water Quality 0 Mandatory Findings of Significance
O Land Use / Planning
ENVIRONMENTAL DETERMINATION
On the basis of this initial evaluation
0 I find that the proposed project COULD NOT have a significant effect on the environment and a
NEGATIVE DECLARATION will be prepared
E I find that although the proposed project could have a significant effect on the environment there will
not be a significant effect in this case because revisions in the project have been made by or agreed
to by the project proponent A MITIGATED NEGATIVE DECLARATION will be prepared
O I find that the proposed project MAY have a significant effect on the environment and an
ENVIRONMENTAL IMPACT REPORT is required
0 I find that the proposed project MAY have a potentially significant impact or potentially significant
unless mitigated impact on the environment but at least one effect 1) has been adequately
analyzed in an earlier document pursuant to applicable legal standards and 2) has been addressed
by mitigation measures based on the earlier analysis as described on attached sheets An
ENVIRONMENTAL IMPACT REPORT is required but it must analyze only the effects that remain
to be addressed
El I find that although the proposed project could have a significant effect on the environment because
all potentially significant effects (a) have been analyzed adequately in an earlier EIR or NEGATIVE
DECLARATION pursuant to applicable standards and (b) have been avoided or mitigated pursuant
to that earlier EIR or NEGATIVE DECLARATION including revisions or mitigation measures that
are imposed upon the proposed project nothing further is required
FISH AND GAME FEE (AB 3158)
[E] I find that the proposed project WILL NOT have an impact on fish or wildlife resources or habitat
upon which fish and wildlife depend I find that the proposed project IS EXEMPT from the Fish and
Game fee A Certificate of Fee Exemption will be prepared for this project
0 I find that the proposed project IS NOT EXEMPT from the Fish and Game fee
3----/Y-5-
Date
Jose Mendivil
Printed Name
Associate Planner
Title|1010|Form Updated 3/16/04 Page 2 of 16a) Have a substantial adverse effect on a scenic vista?
b) Substantially damage scenic resources including but not
limited to trees rock outcroppings and historic buildings
within a state scenic highway?
c) Substantially degrade the existing visual character or
quality of the site and its surroundings?
d) CreaLe a new source of substantial light or glare which
would adversely affect day or nighttime views in the area?|10 9| El
El|10 9| CI 111
z|10 9| CI 0 Z
El 0 0 Z
El
El
CUP P 2005019 & AUP P 2005018 Park Century School
May 18 2005
Potentially
Significant
Impact
EVALUATION OF ENVIRONMENTAL IMPACTS
Potentially
Significant
Impact Unless
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
I. AESTHETICS -- Would the project:
H. AGRICULTURE RESOURCES: In determining whether impacts to agricultural resources are significant environmental
effects, lead agencies may refer to the California Agricultural Land Evaluation and Site Assessment Model (1997)
prepared by the California Dept. of Conservation as an optional model to use in assessing impacts on agriculture and
farmland. Would the project:
a) Convert Prime Farmland Unique Farmland or Farmland of
Statewide Importance (Farmland) as shown on the maps
prepared pursuant to the Farmland Mapping and
Monitoring Program of the California Resources Agency to
non-agricultural use?
b) Conflict with existing zoning for agricultural use or a
Williamson Act contract?
c) Involve other changes in the existing environment which
E l 0
due to their location or nature could result in conversion of
Farmland to non-agricultural use?
III. AIR QUALITY -- Where available, the significance criteria established by the applicable air quality management or air
pollution control district may be relied upon to make the following determinations. Would the project:
a) Conflict with or obstruct implementation of the applicable
air quality plan?
b) Violate any air quality standard or contribute substantially
to an existing or projected air quality violation?|10 9| El El
c) Result in a cumulatively considerable net increase of any
criteria pollutant for which the project region is non-
attainment under an applicable federal or state ambient air
quality standard (including releasing emissions which
exceed quantitative thresholds for ozone precursors)?
d) Expose sensitive receptors to substantial pollutant
concentrations?
e) Create objectionable odors affecting a substantial number
of people?
El El
El El
Form Updated 3/16/04
Page 3 of 16Potentially
Potentially Significant Less Than
EVALUATION OF ENVIRONMENTAL IMPACTS
Significant
Impact
Impact Unless
Mitigation
Significant
Impact
Incorporated
No
Impact
CUP P2005019 & AUP P 2005018 Park Century School
May 18 2005
IV. BIOLOGICAL RESOURCES -- Would the project:
LI z
Have a substantial adverse effect either directly or through
habitat modifications on any species identified as a
candidate sensitive or special status species in local or
regional plans policies or regulations or by the California
Department of Fish and Game or U S Fish and Wildlife
Service?
Have a substantial adverse effect on any riparian habitat or
other sensitive natural community identified in local or
regional plans policies regulations or by the California
Department of Fish and Game or US Fish and Wildlife
Service?
Have a substantial adverse effect on federally protected
wetlands as defined by Section 404 of the Clean Water Act
(including but not limited to marsh vernal pool coastal
etc ) through direct removal filling hydrological
interruption or other means?
Interfere substantially with the movement of any native
resident or migratory fish or wildlife species or with
established native resident or migratory wildlife corridors
or impede the use of native wildlife nursery sites?
Conflict with any local policies or ordinances protecting
biological resources such as a tree preservation policy or
ordinance?
Conflict with the provisions of an adopted Habitat
Conservation Plan Natural Community Conservation Plan
or other approved local regional or state habitat
conservation plan?
V. CULTURAL RESOURCES -- Would the project:
Cause a substantial adverse change in the significance of
a historical resource as defined in 15064 57
Cause a substantial adverse change in the significance of
an archaeological resource pursuant to 15064 59
Directly or indirectly destroy a unique paleontological
resource or site or unique geologic feature?
Disturb any human remains including those interred
outside of formal cemeteries?
Form Updated 3/16/04 Page 4 of 16Potentially
EVALUATION OF ENVIRONMENTAL IMPACTS
Potentially
Significant
Impact
Significant
Impact Unless
Mitigation
Less Than
Significant
Impact
No
Impact
Incorporated
VI. GEOLOGY AND SOILS -- Would the project:
Expose people or structures to potential substantial
adverse effects including the risk of loss injury or death
involving
i) Rupture of a known earthquake fault as delineated on the
most recent Alquist Pnolo Earthquake Fault Zoning Map
issued by the State Geologist for the area or based on
other substantial evidence of a known fault? Refer to
Division of Mines and Geology Special Publication 42
it) Strong seismic ground shaking?
Hi) Seismic related ground failure including liquefaction?
iv) Landslides?
b) Result in substantial soil erosion or the loss of topsoil?
c) Be located on a geologic unit or soil that is unstable or that
would become unstable as a result of the project and
potentially result in on or off site landslide lateral
spreading subsidence liquefaction or collapse?
Be located on expansive soil as defined in Table 18 1-B of
the Uniform Building Code (1994) creating substantial
risks to life or property?
Have soils incapable of adequately supporting the use of
septic tanks or alternative waste water disposal systems
where sewers are not available for the disposal of waste
water?
El El
O 0 El Z
El 0 Z El
CI CI CI Z
CI CI ID Z
O CI 111 Z
O CI CI
El El CI
CUP P2005019 & AUP P 2005018 Park Century School
May 18 2005
VII. HAZARDS AND HAZARDOUS MATERIALS --Would the project:
Create a significant hazard to the public or the environment
through the routine transport use or disposal of hazardous
materials?
Create a significant hazard to the public or the environment
through reasonably foreseeable upset and accident
conditions involving the release of hazardous materials into
the environment?
Emit hazardous emissions or handle hazardous or acutely
hazardous materials substances or waste within one
quarter mile of an existing or proposed school??
Be located on a site which is included on a list of
hazardous materials sites compiled pursuant to
Government Code Section 65962 5 and as a result would
it create a significant hazard to the public or the
environment?
For a project located within an airport land use plan or
where such a plan has not been adopted within two miles
of a public airport or public use airport would the project
result in a safety hazard for people residing or working in
the project area?|1010|Form Updated 3/16/04 Page 5 of 16Potentially
Potentially
EVALUATION OF ENVIRONMENTAL IMPACTS Significant
Impact
Significant
Impact Unless
Mitigation
Less Than
Significant
Impact
No
Impact
Incorporated
VII. HAZARDS AND HAZARDOUS MATERIALS (continued)
For a project within the vicinity of a private airstrip would
the project result in a safety hazard for people residing or
working in the project area?
Impair implementation of or physically interfere with an
adopted emergency response plan or emergency
evacuation plan?
Expose people or structures to a significant risk of loss
injury or death involving midland fires including where
midlands are adjacent to urbanized areas or where
residences are intermixed with wildlands?
LI
LI
LI
z
LI
El
LI
LI
LI
CUP P 2005019 & AUP P 2005018 Park Century School
May 18 2005
VIII. HYDROLOGY AND WATER QUALITY -- Would the project:
Violate any water quality standards or waste discharge
requirements?
Substantially deplete groundwater supplies or interfere
substantially with groundwater recharge such that there
would be a net deficit in aquifer volume or a lowering of the
local groundwater table level (e g the production rate of
pre-existing nearby wells would drop to a level which would
not support existing land uses or planned uses for which
permits have been granted)?
Substantially alter the existing drainage pattern of the site
or area including through the alteration of the course of a
stream or river in a manner which would result in
substantial erosion or siltation on or off site?
Substantially alter the existing drainage pattern of the site
or area including through the alteration of the course of a
stream or river or substantially increase the rate or amount
of surface runoff in a manner which would result in flooding
on- or off site?
Create or contribute runoff water which would exceed the
capacity of existing or planned stormwater drainage
systems or provide substantial additional sources of
polluted runoff?
f) Otherwise substantially degrade water quality?
g) Place housing within a 100 year flood hazard area as
mapped on a federal Flood Hazard Boundary or Flood
Insurance Rate Map or other flood hazard delineation
map?
Place within a 100 year flood hazard area structures which
would impede or redirect flood flows?
Expose people or structures to a significant risk of loss
injury or death involving flooding including flooding as a
result of the failure of a levee or dam?
Inundation by seiche tsunami or mudflow?
Form Updated 3/16/04 Page 6 of 16a) Physically divide an established community?
b) Conflict with any applicable land use plan policy or
regulation of an agency with jurisdiction over the project
(including but not limited to the general plan specific plan
local coastal program or zoning ordinance) adopted for the
purpose of avoiding or mitigating an environmental effect?
c) Conflict with any applicable habitat conservation plan or
natural community conservation plan?
a) Result in the loss of availability of a known mineral
resource that would be of value to the region and the
residents of the state?
b) Result in the loss of availability of a locally-important
mineral resource recovery site delineated on a local
general plan specific plan or other land use plan?
a) Exposure of persons to or generation of noise levels in
excess of standards established in the local general plan or
noise ordinance or applicable standards of other
agencies?
b) Exposure of persons to or generation of excessive
groundborne vibration or groundborne noise levels?
c) A substantial permanent increase in ambient noise levels in
the project vicinity above levels existing without the
project?
d) A substantial temporary or periodic increase in ambient
noise levels in the project vicinity above levels existing
without the project?
e) For a project located within an airport land use plan or
where such a plan has not been adopted within two miles
of a public airport or public use airport would the project
expose people residing or working in the project area to
excessive noise levels?
f) For a project within the vicinity of a private airstrip would
the project expose people residing or working in the project
area to excessive noise levels?
Es]
O 0 a z
O 0 Z 0|10 9| 0 Z 0
O 0 0 Z
Li 0 0
CUP P2005019 & AUP P 2005018 Park Century School
May 18 2005
EVALUATION OF ENVIRONMENTAL IMPACTS
Potentially
Potentially
Significant
Significant
Impact Unless
Impact
Mitigation
Incorporated
Less Than
Significant
Impact
No
Impact
IX. LAND USE AND PLANNING - Would the project:
X. MINERAL RESOURCES — Would the project:
XL NOISE --Would the project result in:
XII. POPULATION AND HOUSING — Would the project:
a) Induce substantial population growth in an area either
z
directly (for example by proposing new homes and
businesses) or indirectly (for example through extension of
roads or other infrastructure)?
Form Updated 3/16/04
Page 7 of 16CUP P 2005019 & AUP P-2005018 Park Century School
May 18 2005
EVALUATION OF ENVIRONMENTAL IMPACTS
Potentially
Significant
Impact
Potentially
Significant
Impact Unless
Mitigation
Incorporated
Less Than
Significant
Impact
XII. POPULATION AND HOUSING (continue)
Displace substantial numbers of existing housing El El El
necessitating the construction of replacement housing
elsewhere'?
Displace substantial numbers of people necessitating the El
construction of replacement housing elsewhere'?
XIII. PUBLIC SERVICES
No
Impact
z
z
a) Would the project result in substantial adverse physical impacts associated with the provision of new or physically
altered governmental facilities need for new or physically altered governmental facilities the construction of which
could cause significant environmental impacts in order to maintain acceptable service ratios response times or other
performance objectives for any of the public services
Fire protection'?
Police protection'?
Schools'?
Parks'?
Other public facilities'?
XIV. RECREATION --
Would the project increase the use of existing
El
El
El
neighborhood and regional parks or other recreational
facilities such that substantial physical deterioration of the
facility would occur or be accelerated'?
Does the project include recreational facilities or require the
construction or expansion of recreational facilities which
might have an adverse physical effect on the environment'?
XV. TRANSPORTATION/TRAFFIC -- Would the project:
Cause an increase in traffic which is substantial in relation
to the existing traffic load and capacity of the street system
e result in a substantial increase in either the number of
vehicle trips the volume to capacity ratio on roads or
congestion at intersections)?
Exceed either individually or cumulatively a level of
service standard established by the county congestion
management agency for designated roads or highways'?
Result in a change in air traffic patterns including either an
increase in traffic levels or a change in location that results
in substantial safety risks'?
Substantially increase hazards due to a design feature
(e g sharp curves or dangerous intersections) or
incompatible uses (e g farm equipment)?
e) Result in inadequate emergency access'?
f) Result in inadequate parking capacity'?
g)
Conflict with adopted policies plans or programs
supporting alternative transportation (e g bus turnouts
bicycle racks)?
Form Updated 3/16/04 Page 8 of 16
El
El
ElPotentially
EVALUATION OF ENVIRONMENTAL IMPACTS
Potentially
Significant
Impact
Significant
Impact Unless
Mitigation
Less Than
Significant
Impact
No
Impact
Incorporated
XVI. UTILITIES AND SERVICE SYSTEMS --Would the project:
Exceed wastewater treatment requirements of the
applicable Regional Water Quality Control Board?
Require or result in the construction of new water or
wastewater treatment facilities or expansion of existing
facilities the construction of which could cause significant
environmental effects'?
Require or result in the construction of new storm water
drainage facilities or expansion of existing facilities the
construction of which could cause significant environmental
effects'?
d) Have sufficient water supplies available to serve the project
from existing entitlements and resources or are new or
expanded entitlements needed'?
e) Result in a determination by the wastewater treatment
provider which serves or may serve the project that it has
adequate capacity to serve the projects projected demand
in addition to the provider s existing commitments'?
f) Be served by a landfill with sufficient permitted capacity to
accommodate the project s solid waste disposal needs'?
g) Comply with federal state and local statutes and
regulations related to solid waste'?
zLI
CUP P 2005019 & AUP P-2005018 Park Century School
May 18 2005
XVII. MANDATORY FINDINGS OF SIGNIFICANCE —
Does the project have the potential to degrade the quality
of the environment substantially reduce the habitat of a
fish or wildlife species cause a fish or wildlife population to
drop below self-sustaining levels threaten to eliminate a
plant or animal community, reduce the number or restrict
the range of a rare or endangered plant or animal or
eliminate important examples of the major periods of
California history or prehistory'?
Does the project have impacts that are individually limited
but cumulatively considerable'? ( Cumulatively
considerable means that the incremental effects of a
project are considerable when viewed in connection with
the effects of past projects the effects of other current
projects and the effects of probable future projects)?
Does the project have environmental effects which will
cause substantial adverse effects on human beings either
directly or indirectly'?
Form Updated 3116/04 Page 9 of 16CUP P 2005019 & AUP P 2005018 Park Century School
May 18 2005
XVIII EARLIER ANALYSES
Revised April 27, 2005, Traffic Study on file with the Planning Division of the City of Culver City,
January 24, 2005, Air Toms Evaluation on file with the Planning Division various maps showing
intersection of 500 foot radius areas for various schools and the proposed school on file with the
Planning Division of the City of Culver City
XIX DISCUSSION
Discussion of Initial Study Checklist responses
I. AESTHETICS
No Impact There are no scenic vistas or resources in the vicinity of the project site that is located in a fully developed
a) through d) urbanized area No significant adverse impacts relative to scenic vistas and resources will occur because
of the proposed project The change of use from manufacturing to educational institution will occur on a
site that is currently developed with a two-story concrete block building that already produces light The
discretionary approval for the project will require implementation of all applicable City zoning standards
and design guidelines including a requirement that all lighting not project onto or create a nuisance for
adjacent public rights of—way and private properties Through these code and design requirements there
will be no impacts adversely affecting views in the area
MITIGATION MEASURE S None re. uired
II. AGRICULTURE RESOURCES:
No Impact The project site is not located on land identified utilized or zoned for agricultural purposes and there is
a) through c) no known Williamson Act contract in effect on the project site
MITIGATION MEASURE(S) None required
III. AIR QUALITY:
No Impact The entire South Coast Air Basin (which includes Culver City) does not meet National Ambient Air Quality
a) through c) Standards Future new development (or re development) in any portion of Culver City will contribute both
and e) at the project level and cumulatively to pollutant emissions over this existing non attainment area (at both
construction and operation phases) It is very likely that any project requiring a Mitigated Negative
Declaration will contribute to pollutant emissions either during construction and/or operations no matter
how minute that contribution may be In addition per the SCAQMD Air Quality Handbook the threshold
of significance for air quality impacts caused by an elementary school such as the one proposed is a
school comprised of 220 000 square feet or more At 43 950 square feet this project is below the
threshold of significance If a proposed project is consistent with the city s General Plan and Zoning
Code the project s operational impacts are considered to be factored into the SCAQMD s regional air
quality models This project as proposed is consistent with Culver City s General Plan and Zoning Code
Because the project s operations are factored into regional air quality models the cumulative air quality
impacts are less than significant Air quality impacts due to construction will be less than significant
because the project applicant will be required to comply with SCAQMD Rule 403 which provides specific
control actions to be implemented during construction activities to control fugitive dust Additionally
elementary school operations generally do not create objectionable odors
MITIGATION MEASURE(S) None required
Less Than Because the site is located within an industrial area there is a potential for children to be exposed to
Significant pollutant concentrations However research on existing surrounding industrial uses indicate that several
Impact SCAQMD permits have been issued to various businesses thereby limiting emissions in the project
d) vicinity and lessening impacts to children that may attend the new school Also uses along Landmark
Street are not incompatible with the school use and do not necessarily require SCAQMD permits or cause
significant emissions
MITIGATION MEASURE S None re. wed
Form Updated 3/16/04
Page 10 of 16CUP P2005019 & AUP P-2005018 Park Century School
May 18 2005
IV. BIOLOGICAL RESOURCES
The project site is located in an urbanized area surrounded by existing disturbed land and development
Information on existing conditions of the project site and materials submitted with the project application
indicate that biological resources as identified by the California Department of Fish and Game or US Fish
and Wildlife Service do not exist on the project site No federally protected wetlands as defined by the
Clean Water Act exist on site
No Impact
a) through f)
MITIGATION MEASURE(S) None required
V. CULTURAL RESOURCES:
No Impact The project site is located in an urbanized area surrounded by existing disturbed land and development
a) through d) Information on existing conditions of the project site and application materials indicate that there are no
identified archaeological paleontological geological and human burial site resources on site
M ITIGATION MEASURE(S) None required
VI. GEOLOGY AND SOILS:
Less than
Significant
Impact a)
The project site is located in an urbanized area surrounded by existing disturbed land and development
and is within a liquefaction zone as identified on the City of Culver City Natural Hazards Map Any new
construction will have to meet all Uniform Building Code requirements and will have to comply with City
and state seismic standards Utilizing these existing regulations geology and soil impacts will be less
than significant
MITIGATION MEASURE(S) None required
No Impact
The site is fairly flat and fully developed with a building and parking area The building is hooked up to the
b) through e) City s sewer system Any new construction will have to meet all Uniform Building Code requirements and
will have to comply with City and state seismic standards
MITIGATION MEASURE(S) None required
VII. HAZARDS AND HAZARDOUS MATERIALS:
No Impact
a) through h)
Environmental information submitted by the applicant with the project plans and application materials
indicates that no hazardous materials will be utilized on the project site Adverse impacts relative to
health hazards are expected to be less than significant Any future use of hazardous materials will be
required to obtain the necessary approvals from the Culver City Fire Department in compliance with
applicable Fire Code regulations
MITIGATION MEASURE(S) None required
VIII HYDROLOGY AND WATER QUALITY:
No Impact
a) through j)
Grading and building plans will be reviewed and approved by the City s Building and Engineering
Divisions to assure that on and off-site drainage will not create significant impacts to drainage facilities
groundwater quality and quantity If applicable an erosion control plan will be required by the City
Engineer to ensure compliance with the Los Angeles County Stormwater Quality Management Program
NPDES Permit No CAS614001 The erosion control plan must include the design and placement of
recommended Best Management Practices (BMPs) to effectively prohibit the entry of pollutants from the
construction site into the public street of storm drain system If applicable the construction contractor will
be required to comply with the California Storm Water Best Management Practice Handbook The site is
not within a flood inundation zone or special flood hazard area as identified on the City s Natural Hazards
Map
MITIGATION MEASURE(S) None required
I &.
Form Updated 3116/04 Page 11 of 16CUP P 2005019 & AUP P 2005018 Park Century School
May 18 2005
IX. LAND USE AND PLANNING:
The project will not physically divide an established community because the site is contiguous on to itself
There is no habitat conservation or natural community conservation plan for this built out urban area
MITIGATION MEASURE(S) None required
The proposed use is consistent with the Industrial and General Corridor General Plan Land Use
designations and is permitted in the Light Manufacturing (M 1) Zone Upon the City s review and approval
of the application the project will be consistent with the City s Zoning Code There is a potential for
limitation on the expansion of current industrial uses and relocation of new industry should the school a
sensitive receptor be allowed to locate in the project site that is within an industrial zone However there
are potential industrial uses that are allowed within the area and that are not considered to be an impact
on sensitive receptors such as a school Also existing industrial uses within the vicinity are not affected
by the school due to the nature of their intensity which could be characterized as clean industries A
street ending at the west end of the project site has a Light Industrial General Plan Designation which
calls for clean industrial uses Some of the allowed uses in this General Plan designation are
compatible with a school use Other schools in the vicinity already serve to limit potential expansion of
industrial uses and several industries within the area are regulated by the South Coast Air Quality
Management District which sets ceilings on the amount of emissions through a permitting process
Finally part of the site is within a commercial General Plan Designation that allows schools Overall
impacts to land use and compatibility with the General Plan will be less than significant
MITIGATION MEASURE(S) None required
No Impact
a)and c)
Less Than
Significant
Impact
b)
X. MINERAL RESOURCES'
Materials submitted with the application and also City Staff site review or the project shows that mineral
resources have not been identified on or within the project site
MITIGATION MEASURE(S) None required
No Impact
a) & b)
XI. NOISE:
Potentially
Because the site will be located in an industrial area near a major artery there is a potential for children to
Significant
be exposed to noise levels in excess of the standards set in the General Plan Noise Element However
Impact
prior to building permit issuance the applicant will be required to submit a noise study to the Building
Unless
Official that identifies proper methods needed to maintain interior and exterior noise levels
Mitigation
Incorporated MITIGATION MEASURE The applicant shall submit to the Building Official a noise study that
a) demonstrates the methods by which standards for interior and exterior noise levels will be attained
Building Permits will not be issued until after the Building Official has approved the noise study
No Impact
The proposed project is not expected to generate significant noise levels and all grading and construction
b) e) and f)
activities will be conducted during the appropriate hours as allowed by the Culver City Municipal Code
The project is not located within and airport land use plan nor within the vicinity of an airport
MITIGATION MEASURE(S) None required
Less Than
Because the uses will change from an industrial to school use there is a potential for increased noise
Significant
levels due to children and parents However theses increased noise levels will only occur during AM and
Impact
early PM drop-off and pick up periods The play area will be within the building A temporary increase in
c) and d) noise levels will occur during construction However most construction will occur within the building with
some re grading of the parking area All grading and construction activities will be conducted during the
appropriate hours as allowed by the Culver City Municipal Code
MITIGATION MEASURE(S) None required
Form Updated 3/16/04 Page 12 of 16CUP P 2005019 & AUP P 2005018 Park Century School
May 18 2005
XII. POPULATION AND HOUSING:
The proposed project is a private school facility with no residential component No impacts to population
or housing are associated with the project
MITIGATION MEASURE(S) None required
No Impact
a) through c)
XIII. PUBLIC SERVICES:
Less Than The project will comply with all applicable California Building and Fire Codes Impacts to fire and police
Significant protection are expected to be less than significant No significant adverse impacts to schools are expected
Impact to result from the project However market competition for the education of learning disabled children
a) could economically affect the Culver City Unified School District should parents decide to place their
children in the new school CEQA does not consider market forces in determining potential impacts
Maintenance of public facilities and requirements for other public services associated with the project are
expected to be incidental and no significant adverse impacts are expected
MITIGATION MEASURE S None re uired
XIV. RECREATION:
No Impact
The proposed project is a school use with its own on site recreation area No significant adverse impacts
a) & b)
relative to recreation are associated with the project
MITIGATION MEASURE(S) None required
Form Updated 3/16/04 Page 13 of 16CUP P2005019 & AUP P-2005018 Park Century School
May 18 2005
XV. TRANSPORTATION/TRAFFIC:
Potentially
A traffic study (dated Revised April 27 2005) was prepared for the project The impacted intersection of
Significant
Landmark St and Washington BI is controlled by a stop sign on the Landmark St approach The
Impacts
intersection is currently functioning at Level of Service (LOS) F The requirement for a traffic signal to be
Unless
installed at the intersection will mitigate the impacts of the school The new signal would also be required
Mitigation
to connect to the Automated Traffic Surveillance and Control coordinated signal system operated by the
Incorporated City of Los Angeles The school also proposes to establish a combination of offset start and dismissal
a)
times for students and staff With the proposed improvements average vehicle delay is projected to be
reduced at the Washington BI and Landmark St intersection
MITIGATION MEASURE(S)
1 A traffic signal shall be installed at the intersection of Washington Boulevard and Landmark Street
The new signal shall be connected to the Automated Traffic Surveillance and Control (ATSAC)
coordinated signal system operated by the City of Los Angeles
2 As discussed in the Revised April 27 2005 Traffic Study for the Park Century School the school
shall establish a combination of offset start and dismissal time for students and staff Said schedule
shall be subject to approval of the Traffic Engineer and Planning Division
No Impact
In the traffic study conducted for this project an analysis of the project s traffic impact on the regional
b) through g) transportation system was conducted in accordance with the transportation impact analysis (TIA)
procedures outlined in the 2004 Congestion Management Program for Los Angeles County If a project
would add 50 or more peak hour trips (of adjacent street traffic) to a Congestion Management Program
(CMP) arterial intersection then a CMP arterial intersection analysis must be conducted Based on the
traffic study analysis the project would not add more than 50 morning or afternoon peak hour trips at any
of the CMP arterial monitoring intersections nearest the project Thus no further analysis is required
The project will not result a change in any air traffic patterns or traffic levels The site is fully developed
with no dangerous design features There currently exists and will remain one ingress and egress
driveway onto Landmark St The requirement to add a traffic signal at the Washington BI intersection will
actually allow for safer turns into and out of Landmark St The site will continue to maintain an
emergency-only access gate at the rear of the property onto Lindblade St resulting in adequate
emergency access
The Culver City Municipal Code requires 47 parking spaces for this project and 47 spaces are being
provided Eight of the spaces are proposed to be blocked access spaces The project will not affect any
City or regional adopted policies plans or programs supporting alternative transportation
MITIGATION MEASURE(S) None required
XVI. UTILITIES AND SERVICE SYSTEMS:
a) through g) The proposed project will connect to existng utilities available to the project site No significant adverse
impacts to utilities are expected from project implementation
MITIGATION MEASURE(S) None required
9, 1
Form Updated 3/16/04 Page 14 of 16CUP P 2005019 & AUP P 2005018 Park Century School
May 18 2005
XVII. MANDATORY FINDINGS OF SIGNIFICANCE:
No Impact The project will not have significant impacts to any plant or animal wildlife species or cause substantial
a) adverse effects on human beings
MITIGATION MEASURE(S) None required
Less Than The proposed school would cause traffic impacts in the surrounding area and add to the cumulative traffic
Significant in the area However with the proposed mitigation measures implemented the LOS at the Washington BI
Impact and Landmark St intersection will be improved even at today s LOS (See discussion under the
b) and c) Transportation section) As the site is located in an industrial area there is a potential for children to be
exposed to pollution Existing uses along Landmark Street are not incompatible with the school Any
uses that may be incompatible with the school use would most likely require SCAQMD permits that would
limit emissions in the project vicinity
MITIGATION MEASURE(S) None required
Form Updated 3/16/04 Page 15 of 16CUP P 2005019 & AUP P 2005018 Park Century School
May 18 2005
MITIGATION MONITORING PROGRAM
The following environmental mitigation measures shall be incorporated into the project development as conditions of
approval The project applicant shall secure a signed verification for each of the mitigation measures which indicates that
mitigation measures have been complied with and implemented and fulfills the City environmental and other
requirements (Public Resources Code Section 21081 6 ) Final clearance shall require all applicable verification as
included in the following table The City of Culver City will have primary responsibility for monitoring and reporting the
implementation of the mitigation measures unless otherwise indicated The mitigation measures have been identified by
impact category and numbered for ease of reference
MITIGATION MONITORING PROGRAM
CUP P 2005019 and AUP P-2005018
Park Century School
MITIGATION MEASURE TIMING
I VERIFICATION OF COMPLIANCE
DEPT.: SIGNATURE. DATE:
NOISE
A 1 Prior to issuance of any building permits the
applicant shall submit a noise study to the
Building Official identifying the construction
methods needed to maintain interior and
exterior noise levels to within the standards
set in the General Plan Noise Element
Prior to
issuance of
building
permits
Planning
Building
TRANSPORTATION/TRAFFIC
T 1 A traffic signal shall be installed at the
intersection of Washington Boulevard and
Landmark Street The new signal shall be
connected to the Automated Traffic
Surveillance and Control (ATSAC)
coordinated signal system operated by the
City of Los Angeles
_
Prior to final
release by
Building and
Safety
inspectors
of electrical
and gas
utilities
Public Works
T 2 As discussed in the Revised April 27 2005
Traffic Study for the Park Century School
the school shall establish a combination of
offset start and dismissal time for students
and staff Said schedule shall be subject to
approval of the Traffic Engineer and
Planning Division
Prior to
issuance of
building
permits
Pubic Works
Planning
References Utilized|109| Culver City General Plan Land Use Element and Noise Element|109| Culver City Zoning Code|109| Culver City Natural Hazards Map|109| Traffic Study for the Park Century School (Revised April 27 2005)|109| Project application materials
Form Updated 3/16/04 Page 16 of 16Attachment No 7
RESOLUTION NO 2005-R
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CULVER CITY, CALIFORNIA, UPHOLDING AN APPEAL
FILED BY HOWARD INDUSTRIES (APPEALANT)
THEREBY AMENDING CONDITION NO 43 (RELATING
TO INSTALLATION OF A LEFT TURN LANE) OF
CONDITIONAL USE PERMIT, CUP P-2005019 AND
ADMINISTRATIVE USE PERMIT, AUP P-2005018 THAT
ALLOWS THE ESTABLISHMENT OF A PRIVATE SCHOOL
WITH TANDEM PARKING AT 3939 LANDMARK STREET
IN THE LIGHT MANUFACTURING (M-1) ZONE
(CUP P-2005019 and AUP P-2005018)
WHEREAS, on March 10, 2005, an application was filed for a Conditional Use
Permit and Administrative Use Permit for the establishment of a private school with tandem
parking at 3939 Landmark Street, being Lot 12 and a portion of Lot 13 of Tract No 29708, in
the Light Manufacturing (M-1) Zone and,
WHEREAS, on June 8, 2005, the Planning Commission opened a duly noticed
public hearing for Conditional Use Permit, CUP P-2005019 and Administrative Use Permit,
AUP P-2005018, for the establishment of a private school and continued the hearing to July
13 2005, in order to comply with the required public review period as stipulated in the
California Environmental Quality Act (CEQA), and,
WHEREAS, on July 13 2005, the Planning Commission continued the duly
noticed public hearing on Conditional Use Permit, CUP P-2005019 and Administrative Use
Permit AUP P-2005018, fully considering the applications, site plans, staff reports,
environmental information and all testimony presented, and,
WHEREAS, in accordance with CEQA, the City provided public notice of the
intent to adopt a Mitigated Negative Declaration for this project and based upon the initial
7,'( Page 1 2005-R
I|1010101010101010 10
10|11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
study, public comments, and the record before the Planning Commission the project was
determined to not have a significant adverse impact on the environment provided certain
mitigations are required, and the Planning Commission hereby adopted a Mitigated Negative
Declaration and,
WHEREAS, on July 13, 2005, following conclusion of the public discussion and
thorough deliberation of the subject matter, the Planning Commission determined by a vote
of 3 to 1 that Conditional Use Permit, CUP P-2005019 and Administrative Use Permit, AUP
P-2005018, should be conditionally approved and adopted Resolution No 2005-P013, and,
WHEREAS, No new information has been provided regarding the project or any
potentially significant environmental impacts since approval of the Mitigated Negative
Declaration by the Planning Commission, therefore, no further environmental action is
required, and,
WHEREAS on September 12 2005, Howard Industries submitted an appeal to
Conditional Use Permit, CUP P-2005019 and Administrative Use Permit, AUP P-2005018,
requesting reconsideration of certain aspects of Condition No 43, relating to the installation
of a left turn pocket on westbound Washington Boulevard at the intersection with Landmark
Street, of the Planning Commission Conditions of Approval as stated in Planning
Commission Resolution No 2005-P013 and
WHEREAS discussions with the Applicant, Appellant, and City staff have lead
to proposed modifications to Condition No 43 that are acceptable to all parties and,
WHEREAS, on November 14 2005, at its regular meeting, a duly noticed public hearing the
City Council heard the appeal and proposed modifications to Condition No 43 of Planning
Commission Resolution No 2005-P013, gave an opportunity for all interested parties to
Page 2 2005-R
I|1010101010101010 10
10|11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28speak and after consideration of all testimony, determined to uphold the appeal approving
certain modifications to Condition No 43 of Planning Commission Resolution No 2005-
P013
NOW, THEREFORE the City Council of the ' City of Culver City California,
DOES HEREBY RESOLVE as follows|109| That no new information has been made available since Planning
Commission adoption of the Mitigated Negative Declaration, which finds Conditional Use
Permit, CUP P-2005019 and Administrative Use Permit, AUP P-2005018 will not have a
significant effect on the environment provided certain mitigation measures are incorporated
into the Conditions of Approval, therefore no further environmental action is required|109| That the Appellant has demonstrated and the Applicant and City staff
concur that the nature of the project is an appropriate basis for modifications to Condition of
Approval No 43, related to the installation of a left turn pocket on westbound Washington
Boulevard at the intersection with Landmark Street
3 That based on the foregoing the City Council does hereby uphold the
appeal thereby amending Condition No 43 of Planning Commission Resolution No 2005-
P013 as set forth below
The applicant shall install a traffic signal at the intersection of Washington
Boulevard and Landmark Street The new traffic signal shall be connected to
the City s ATSAC system, contain a battery backup system and shall be
installed with a Transit Priority System (this is a mitigation measure) The
applicant shall a lcft turn pocket along westbound Washington
The applicant shall conduct
and complete a traffic study ( 'Traffic Study ) within 12 months following the
commencement of school operations (considered to be the first day of
classes) or at an earlier date as determined by the Planning Manager The
Page 3
2005-R|101010101010101010 10
10|11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28scope of the Traffic Study shall be determined by the City's Traffic Engineer
and the Planning Manager The Traffic Study shall examine the need for a
left turn lane on Washington Boulevard at Landmark Street, shall make a
recommendation as to whether a left turn lane is required and, if required,
shall recommend a configuration for the left turn lane The Traffic Study shall
be subiect to review and approval by the Planning Division and the Public
Works/Enqineenng Department Prior to issuance of a building permit, the
applicant shall post a bond with the City, in a form satisfactory to the Public
Works/Enqineennq Department, in the amount of twenty five thousand dollars
($25,000 00) to pay the cost of implementing a left turn lane on Washington
Boulevard at Landmark Street should the City decide to implement such a left
turn lane within a four (4) year period following the issuance of a Certificate of
Occupancy The bond shall be returned to the applicant if no such left turn
lane is deemed necessary by the City within four (4) years following the
issuance of a Certificate of Occupancy
APPROVED and ADOPTED this day of , 2005
ALBERT VERA, MAYOR
City of Culver City, California
ATTEST APPROVED AS TO FORM
CHRISTOPHER ARMENTA,
CAROL A SCHWAB,
City Clerk
City Attorney
A05 00629
9:7
Page 4 2005-R|101010101010101010 10
10|11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28Attachment No 8
C20 Coolidge Drive Suite 1B5
Folsom CA 95630
(S16) 053 2150 FAX (916) 353 2155
GEOMATRIX
CONFIDENTIAL
ATTORNEY-CLIENT PRIVILEGED
ATTORNEY WORK PRODUCT
January 24, 2005
Project No 10322
Sean T Matsler, Esq
Latham & Watkins, LLP
633 West 5 th Street, Suite 4000
Los Angeles, CA 90071
Subject Status Report - Air Tomes Evaluation
Proposed Park Century School Site
Dear Mr Matsler
fireftrill
MAR 1 0 2005
Cu/ver city
tic:Inning Division
As requested, we have been collecting and reviewing the available information on potential
air toxics emissions within the area surrounding the proposed site for the Park Century School
to be located at 3939 Landmark Street, Culver City (the "site") This review is designed to
assist us in determining if there is a need for further assessment of potential health impacts
from air tomes in the area of the proposed school Consistent with the voluntary guidelines
presented in Chapter 4 of the South Coast Air Quality Management District's ( SCAQMD )
Air Quality Analysis Guidance Handbook', our review has focused on identifying any
industrial activities within the area surrounding the proposed school site that might be
releasing toxic air contaminants in amounts that could potentially be of concern If any such
release is identified, we would then quantify the potential impacts at the school site using
common health risk assessment methodologies
Based on the information obtained from the SCAQMD and California Air Resources Board
( CARB ) regarding facility emissions, and focusing on the most likely significant emitters,
we have not identified any source of air tomes in the neighborhood that has the potential to be
a significant nsk factor warranting further evaluation and quantification We are continuing
our review of facilities, but those remaining to be reviewed appear less likely to have air toxic
emissions
BACKGROUND
We have relied on a hierarchy of information to identify potential sources of air tomes in the
neighborhood The first tier was a list of all business within 1,000 feet of the site that was
prepared by Slcyers & Associates in response to a request by the Culver City Community
Development Department (attached) Simple inspection of this list shows a number of
businesses that would not be expected to use chemicals of any type in any large amount or be
a source of chemical emissions Retail establishments, radio stations, and business offices, for
'See http //www aqmd gov/ceqa/handbook/CH4 DOC
Geomatroc Consultants, Inc
Engineers Geologists and Environmental Scientists
7,sGEDIVIATRIX
Sean T Matsler, Esq CONFIDENTIAL
Latham & Watkins, LLP ATTORNEY-CLIENT PRIVILEGED
January 24 2005 ATTORNEY WORK PRODUCT
Page 2
example, fit this definition These facilities were not reviewed further Significantly, there
were no facilities on the list that are busmesses identified by SCAQMD 2 as major sources of
air tomes (e g , battery manufactunng, dye casting, electroplating, petroleum refining,
photography, etc ) Other facility descriptions (e g , pamt shops), although not identified by
the SCAQMD as likely sources of significant air emissions, were presumed to be potential
sources of chemical release pending additional information and became the focus of our
review
The second tier of information was a list of facilities with permits (or applications for permits)
to operate equipment that might release chemicals, but not necessarily air tomes, within one-
quarter or one-half mile of the site, as compiled by the SCAQMD This information is
contained in a letter from the SCAQMD to Ms Karen Spinney of CNS Environmental, Inc ,
dated May 19, 2004 (attached) The list, as identified by name, includes schools, fire stations,
paint shops, auto repair shops and other less readily identified business activities Fifteen
sites were within one-quarter mile, the size of the area identified by the SCAQMD 3 m its
guidelines An additional nineteen sites were within one-half mile Although they are of
secondary interest, these more distant facilities were also screened for potential air toxic
emissions It is our opinion that this list represents the most complete identification of
facilities with some type of air emissions, potentially including toxic air contaminants, since it
is the SCAQMD s responsibility to regulate sources of air emissions Sources of emissions
not known to the SCAQMD would presumably be operating illegally
FINDINGS
We used the SCAQMD list of permitted facilities to query the database maintained by CARB
CARB coordinates the activities of local air quality agencies, including the SCAQMD, and
collects information on the emissions of chemicals from California industrial facilities
Significant sources of air toxic contaminants should be identified within the CARB database
and facilities not on the list are probably not generating sigruficant toxic air contaminants
The database contained information on five (three within one-quarter mile) of the facilities
identified by the SCAQMD The database identified the following
1 Finish First (furniture refinishing, stripping and repairs) Emission data available for
2002 included 3 2 tons per year of organic gasses No health risk assessment has been
required
2 Cytech Fibente (formerly Culver City Composites) Emission data available from
1996 A health risk assessment had been completed
2 lbld
3 lbld
9.9GEOMATRIX
Sean T Matsler, Esq CONFIDENTIAL
Latham & Watkins, LLP ATTORNEY CLIENT PRIVILEGED
January 24, 2005 ATTORNEY WORK PRODUCT
Page 3
3 Ian Walmsley Design "Zero emissions or No Facility Data Found"
4 Helms Antiques, Inc (greater than one quarter mile, but less than one-half mile from
site) Emission data available for 2002 mcluded 1 1 tons per year of total organic
gasses No health nsk assessment has been required
5 70 MM (greater than one-quarter mile and less than one-half mile from site)
Emission data available for_2002 included 1 0 tons per year of total organic gasses
No health nsk assessment has been required
The CARB database mformation provided important clues to identifying potentially
significant facilities for our review First, the database captures important sources of air
emissions, the very few facilities identified in the CARB database serves to focus attention on
facilities with the potentially largest contnbution to air emissions Second, the total amount
of emissions for each facility is presented It is important to note that this total, while it may
contain specific toxic air contaminants, is predominately compnsed of chemicals with low
toxicity This determination can, m general terms, be refined by whether or not a health risk
assessment had been required for the facility Facilities with potentially significant releases of
toxic air contaminants are required to prepare health risk assessments under California's
'Toxic Hot Spot (AB2588) regulations Only one of the facilities, Cytech Fibente, had
apparently been required to do so in 1996 and that fact would make this a high priority facility
for our review However, as noted below, this facility is no longer in operation in the area
The final source of information is the individual facility files maintained by the SCAQMD
These files form the basis for the initial list of facilities and contain all of the information on
equipment, chemical use, details of facility inspections conducted by the SCAQMD and, for a
few facilities, complaints regarding facility emissions The files of facilities closest to the site
have been prioritized for review, specifically those within one-quarter mile Within this group
the file for Cytech Fibente was the highest pnonty Individual facility files were requested
through the procedures established by SCAQMD and copied by Ms Mary Hamson
Those reviewed to date include the following
Adam Paint Shop (8931Y2 National Blvd, Los Angeles) This facility is approximately 0 2
miles to the northwest of the site The facility paints and stains wooden shutters The
SCAQMD permits three spray paint booths and one stain dip tank Emissions from the spray
booths are controlled and maximum emission limits are in place Total chemical usage is low
and the SCAQMD routinely monitors compliance The causes of past complaints (e g,
chemical odor, release of dusts in the immediate vicmity) were reported as being correctedGEOIVIATRIX
Sean T Matsler, Esq CONFIDENTIAL
Latham & Watkins, LLP ATTORNEY-CLIENT PRIVILEGED
January 24, 2005 ATTORNEY WORK PRODUCT
Page 4
The release of toxic air contaminants, if any, from this facility would be negligible in terms of
quantity and there would be no reason to expect impacts on air quality at the school site
Beverly Hills Body (8951 Venice Blvd, Los Angeles) This facility is a little less than 0 2
miles to the west of the site It has a permit from the SCAQMD for a paint spray booth used
in the repair of automobiles Emissions from the booth are controlled Maximum paint usage
is two gallons per day
The release of toxic air contammants, if any, from this facility would be negligible in terms of
quantity and there would be no reason to expect impacts on air quality at the school site
AAA Flag & Banner Mfg Co (8951 National Blvd, Los Angeles) This facility is a little
more than 0 2 miles to the northwest of the site The facility manufactures banners and flags
through screen pnntmg followed by oven drying The SCAQMD permits are in place for
pnntmg and drying equipment, as necessary Emissions of volatile organic chemicals
associated with inks, lacquer thinner and acetone are limited by permit conditions
Histoncally, numerous complaints related predominately to odor in the immediate vicinity
have been lodged against the facility The SCAQMD was very involved in responding to the
complaints and it appears that corrective measures (i e, an increase m stack height)
eliminated the complaints
The release of toxic air contaminants, if any, from this facility would be negligible in terms of
quantity and there would be no reason to expect impacts on air quality at the school site
Glassers Automotive Repair (8750 Washington Blvd , Culver City) This facility is slightly
less than 0 2 miles to the north of the site The SCAQMD permits are in place for an
automobile paint spray booth The total amount of paint that may be used in any one day is
limited to three gallons and the spray booth controls particulate emissions
The release of toxic air contaminants, if any, from this facility would be negligible m terms of
quantity and there would be no reason to expect impacts on air quality at the school site
Cytec Fib erite (3512 Helms Ave , Culver City) This facility was approximately 0 2 miles to
the east of the site Consistent with the CARB database described above, this facility had a
number of permits with the SCAQMD and likely had a complex emission profile All of the
permits are currently inactive and the facility is described as "out of business
s/GEOMATRIX
Sean T Matsler, Esq CONFIDENTIAL
Latham & Watkins, LLP ATTORNEY-CLIENT PRIVILEGED
January 24, 2005 ATTORNEY WORK PRODUCT
Page 5
SUMMARY
The information gathered to date supports that none of the facilities m the vicinity of the site
represent a source of potentially significant toxic air contaminants and their operations do not
represent a potential for adverse health impacts at the school site
I am available at your convenience if you have any comments or questions
Sincerely yours,
GEOMATRIX CONSULTANTS, INC
mbree, Ph D , DAI3T
Pnncip oxicologist
\projects \ 10322 park entury sch \revised clean status report 1 21-05
AttachmentsBUSINESSES WITHIN 1,000 FEET OF 3939 LANDMARK STREET
Property
No NUMBER STREET BUSINESS NAME DESCRIPTION STATE/FEDERAL LIST
1 8827 Exposition Blvd [No signage] [Unknown use]
2 8829 Exposition Blvd Metal Art Metal fabrication
3 8831 Exposition Blvd [No signage] [Unknown use]
4 8839 Exposition Blvd [No signage] [Unknown use]
5 8843 Exposition Blvd [Signage vandalized] [Unknown use]
6 8850 Exposition Blvd [No signage] [Unknown use]
7 8860 Exposition Blvd Classic Fine Finish Furniture Furniture refinishing
8 8860 1/2 Exposition Blvd Cabinet 2000 Custom Woodwork Custom furniture
9 8860B Exposition Blvd A L S
Furniture stripping fine
finishes kitchen furniture
antique restoration hand
stripping
10 3940 Higuera St [Vacant Building] [Unknown use]
11 3951 Higuera St [Vacant Building] [Unknown use]
12 3960 Higuera St Westwood One Companies Parking Lot
13 3969 Higuera St Jerry s Market & Deli Market
14 3947 Landmark Street Hands Services
Order fulfillment mass
mailing
15 3947 Landmark Street Rubber Supply Co
Resale of rubber products
No mfg
16 3960 Landmark Street World Cuisine Culinary Equipment [Unknown use]
17 3961 Landmark Street AA Wireless Inc
Cellular phones distribution
and accessories
18 3962 Landmark Street MYCEL
Office supply
shipping/fulfillment
19 3965 Landmark Street Pacifica Consulting Services
Janitorial Supply Paper
distributor
20 3965 Landmark Street Sermon Systems Inc
Janitonal Supply Household
cleaning supplies and floor
wax
21 3975 Landmark Street Event Solutions Catering
22 3975 Landmark Street DIVA Warehouse [Unknown use]
23 8906 Lindblade St Taos Tacos (Kitchen) Food preparation
24 8921 Lindblade St UCLA Book Bindery Book bindery
25 8924 Lindblade St Abramson Teiger Architects Architectural practice
26 8925 Lindblade St Lindblade Hotel Hotel
27 8930 Lindblade St Rover Dog Kennels
12/20/2004 1 32 PM
Skyers & Associates
Page 1 of 5BUSINESSES WITHIN 1,000 FEET OF 3939 LANDMARK STREET
Property
No NUMBER STREET BUSINESS NAME DESCRIPTION STATE/FEDERAL LIST
28 8935 Lindblade St Metro Networks Radio Station
29 8944 Lindblade St KTWV - The Wave Radio Station Radio Station UST
30 8965 Lindblade St Westwood One Companies
Sales office for radio
network
31 9014 Lindblade St Caggiano Fine Leather Retail
32 9018 Lindblade St [Vacant Building] [Unknown use]
33 8690 National Blvd Alger International Manufacture lights
34 8780 National Blvd Turning Point School School
35 8824 National Blvd [No signage Looks occupied] [Unknown use]
36 8825 National Blvd Surfas
Restaurant equipment
Supplies Gourmet Foods
37 8828 National Blvd [Vacant building] [Unknown use]
38 8829 National Blvd Palms Self Storage Storage
39 8833 National Blvd Plummer s Furniture Retailer
40 8834 National Blvd Harry Art Furniture Showroom
41 8836 National Blvd Finish First
Fine furniture refinishing
hand stripping repairs
42 8840 National Blvd [Vacant building] [Unknown use]
43 8842 National Blvd Stone Candles Factory Outlet Retail Candle Sales
44 8884 National Blvd Civilization Furniture Retailer
45 8794 National Blvd
Warehouse for Motion Picture
Studios Storage
46 3700 Robertson Blvd FedEx Mail/package distribution LUST UST
47 3719 Robertson Blvd [Vacant Building] [Unknown use]
48 3723 Robertson Blvd Janor Tool & Machine Tool and machine shop
49 3727 Robertson Blvd Sound Arena Studios Music Studio
50 3729 Robertson Blvd From Wags 2 Whiskers Dog boarding & daycare
51 3731 Robertson Blvd Cold Fusion
Corporate office for nutrition
food company
52 3733 Robertson Blvd Upholstery Upholstery
53 3737 Robertson Blvd [No signage] [Unknown use]
54 3741 Robertson Blvd Butch s Truck & Auto Auto repair
55 3743 Robertson Blvd Mono Tech
Tool & Engineering Co
Tools-Jigs Fixtures
Prototype & Production
Machining
56 3747 Robertson Blvd [Vacant buildnig] [Unknown use]
12/20/2004 1 32 PM
Skyers & Associates
Page 2 of 5BUSINESSES WITHIN 1,000 FEET OF 3939 LANDMARK STREET
Property
No NUMBER STREET BUSINESS NAME DESCRIPTION STATE/FEDERAL LIST
57 3749 Robertson Blvd [No signage] [Unknown use]
58 3750 Robertson Blvd Multimedia Systems Office use
59 3750 Robertson Blvd Labite com Restaurant Delivery Restaurant Food Delivery
60 3751 Robertson Blvd Digital Soup Digital art layout
61 3760 Robertson Blvd Plasma T V Gallery [Unknown use]
62 8949 Venice Blvd Beverly Hills Body & Paint
NOTE Outside of 1 000 ft
Radius Spray booths Auto
paint
63 8953 Venice Blvd Early Scheib Paint & Body
NOTE Outside of 1 000ft
Radius Spray booths Auto
paint
64 8740 W Washington Blvd ECF Par Services
Reseller of Hospital bed
tables and beds
65 8748 W Washington Blvd Tesserae Custom Mosaics
Custom mosaic art
pieces/Furniture
66 8750 W Washington Blvd Glasser s Auto Body Body Shop
67 8810 W Washington Blvd Culver City Mazda/Nissan Nissan dealership
RCRIS CORTESE LUST
CA FID
68 8817 W Washington Blvd The Jungle Tropical Plants Plant Nursery
69 8850 W Washington Blvd Culver City Hyundai Hyundai dealership RCRIS CORTESE LUST
70 8855 W Washington Blvd Howard Industries
Heating A/C Refrigeration
Sheet Metal Wholesale
distributors Parts supplies
Equipment
71 8888 W Washington Blvd Insurance Collision Center Body Shop
72 8910 W Washington Blvd Burke Williams Corporate Office
Corporate office and training
facility for Day Spa
73 8966 W Washington Blvd Westwood One Companies Sales office for radio network
74 8970 W Washington Blvd DalTile Showroom/Contractor
75 8723 8739 W Washington Blvd Mercier Wimberg Studio Office and Studio use
76 8723 8739 W Washington Blvd Yokotake Design & Associates Office and Studio use
77 8723 8739 W Washington Blvd ah be Landscape Architects Office and Studio use
78 8723 8739 W Washington Blvd Studio ll Office and Studio use
79 8723 8739 W Washington Blvd Ultimatum Music Office and Studio use
80 8723 - 8739 W Washington Blvd Richard Ruthsatz Photography Office and Studio use
12/20/2004 1 32 PM
Skyers & Associates
Page 3 of 5BUSINESSES WITHIN 1,000 FEET OF 3939 LANDMARK STREET
Property
No NUMBER STREET BUSINESS NAME DESCRIPTION STATE/FEDERAL LIST
81 8723 - 8739 W Washington Blvd Peter MacArthur Studio Office and Studio use
82 8741 8745 W Washington Blvd IT Studios Office and Studio use
83 8741 - 8745 W Washington Blvd RKADE Office and Studio use
84 8741 8745 W Washington Blvd Krasner Studio Office and Studio use
85 8741 - 8745 W Washington Blvd Polar Bear Productions Office and Studio use
86 8741 8745 W Washington Blvd Vogler Audio Media Office and Studio use
87 8741 - 8745 W Washington Blvd Dick Zimmerman Studio Office and Studio use
88 8741 8745 W Washington Blvd NTIUS Office and Studio use
89 8753 - 8763 W Washington Blvd Artisan Restoration Centre Office and Studio use
90 8753 8763 W Washington Blvd Light Space Office and Studio use
91 8753 - 8763 W Washington Blvd Summit Architects Collaborative Office and Studio use
92 8753 - 8763 W Washington Blvd Prefix Office and Studio use
93 8753 8763 W Washington Blvd Loucheim Studio Office and Studio use
94 8781 & 8777 W Washington Blvd [Vacant building] [Unknown use]
95 8786 - 8770 W Washington Blvd Spartan Supply Roofing Materials
Reseller of supplies No
manufacture
96 9055 W Washington Blvd Miller Honda Only parking lot within radius
97 9094 W Washington Blvd Sony Pictures Parking area for Sony
98 3416 Wesley St GPO Accessories
Reseller of Wireless
Accessories
99 3418 Wesley St [No signage] [Unknown use]
100 3429 Wesley St [No signage] [Unknown use]
101 3431 Wesley St Wesley Studios Studio/Office use
102 3434 Wesley St Studio City Auto Dismantlers Used car parts
103 3444 Wesley St Clyde s Auto Body Shop Auto repair
104 3444 Wesley St A-1 Upholstery Shop
Upholstery shop with auto
body shop
105 3444 Wesley St Clyde s Auto Sales With auto body shop
106 3520 Wesley St Playa Digital Media Digital Prepress
12/20/2004 1 32 PM
Skyers & Associates
Page 4 of 5BUSINESSES WITHIN 1,000 FEET OF 3939 LANDMARK STREET|1010| Property
No NUMBER STREET BUSINESS NAME DESCRIPTION STATE/FEDERAL LIST
RCRIS
UST
LUST
CA FID
CORTESE
LEGEND FOR STATE/FEDERAL LIST ACRONYMS
Resource Conservation and Recovery Information System RCRIS includes selective information on sites
which generate, transport, store, treat and/or dispose of hazardous waste as defined by the Resource
Conservation and Recovery Act (RCRA)
Underground Storage Tank Data from State Water Resources Control Board $
Hazardous Substance Storage Container Database
Leaking Underground Storage Tank Data from State Water Resources Control Board s Hazardous Substance
Storage Container Database
The Facility Inventory Database contains active and inactive underground storage tank
locations The source is the State Water Resource Control Board
This database identifies public drinking water wells with detectable levels of contamination
hazardous substance sites selected for remedial action sites with known toxic material identified
through the abandoned site assessment program sites with USTs having a reportable release and all
solid waste disposal facilities from which there is known migration The source is the California
Environmental Protection Agency/Office of Emergency Information
Skyers & Associates Page 5 of 5
12/20/2004 1 32 PM05/20/2004 16 12 5628685445
PAGE 02
05/19/2004 10 09 SCAGMD 1 9155286E35445
H0838 1?001
1711
South Coast
Air Quality Management District
21865 E Copley Dnve, Diamond Bar, CA 91765-4182
'-^n -sr (909) 396-2000 www aqmd gov
May 19, 2004
Ms Karen Spinney
CNS Environmental, Inc
12440 Firestone Blvd., 0228
Norwalk, CA 90650
Dear Ms Spinney
Thank you for your May 12, 2004 request to identify facilities with the potential to emit
hazardous or acutely hazardous air emissions located within one-quarter mile of the
proposed school site, Park Century School, located at 3939 Landmark St, Culver City
In response to your request, the South Coast Air Quality Management District (AQMD)
is providing the following mformation in accordance with Public Resources Code
21151 8(a)(4)
1 A map showing all facilities, with AQMD permits or pending applications, that
are located within a radius of one-quarter and one-half mile of the proposed
school site
2 A list identifying each facility shown on the map
Please be advised that tins Information only covers facilities that have permits or pending
applications with the AQMD Other facilities
that emit hazardous or acutely hazardous
air emissions and do not exist in AQMD records may be located within one-quarter mile
of the proposed school site
In accordance with AQIviD Rule 301(i)(8), an invoice in the amount of $23227 is
enclosed to cover the costs of developing and providing the requested mformaton.
Please submit this fee to the AQMD vnthin thirty (30) days of the invoice date
If you have any questinna regarding the enclosed information, please call Ms Nancy
Velasquez at (909) 396-2557
Sincerely,
Mohan Nagavedu
Supervising Air Quality Inspector
TOMOS and Waste Management Team
MN IC
Enclosures
Record #2004-46ACIIVID-listed facilities within 0.26 or 0.60 mile of
proposed Park Century Schools
3939 Landmark St, Culver City
• PennlitedFaclIktiesaap
"/ Calosas.shp
2004-46
Cn 1FAC.;tn L iANW: I- --F2.'.ilf:N -,.1)C,t1-•.!-, •:', - t; 1)!5: At. :1_, ' , Jir LI-i--
90034 4026 exils
1111
,
00034 .025141118
GLASSERS AUTOMOTIVE REPAIR 8750 WASHINGTON BLVD t 90232 402.5 nn66
75024 MA FLAG 5 BANNER MFG CO INC 8951 ! NATIONAL BLVD STE KM OS ANGELES 90034
t
.025 ram
77211 FINISH FIRST 8838 NATIONAL BLVD 'CULVER CITY CA 90232 4025 ens
108317 IAN WALMSLEY DESIGN 38251 VVILLAT AVE CULVER CITY 90282, 4oza mils
107014 CLYDE'S AUTO BODY SHOP INC 3444 WESLEY ST CULVER CITY GA 32 , 428 mite
109794 LVER STUDIOS OFFICE BLDG SONY PICTURE 9050 WASH/NC/TON BLVD AM 3421 CULVER CITY CA 90232 .025 mils
113407 ADAN'S PAINT STORE 0931 NATIONAL BLVD LOS ANGELES GA 0034 .05 m114
115128 EARL SCHEIB OF CAIFORNIA INC. 8953 VENICE BLVD LOS ANGELES CA 90034 40.25 mlin -,
115606 & B FINXHING_ 8000 EXPOSITION BLVD CULVER CITY 90232 - 4025 mire
118996 CYTEG FIBERITE INC 3512 HELMS AVE CULVER CITY 90232 4025 mils
119291 ClASSIO FURNITURE INC 8915 NATIONAL BLVD LOS ANGELES CA 90034 4025 mils
120339 CLASSIC DESIGN 1520 WESLEY ST cuLVER0irt CA 00232, 4026 mile
126784 IIMICE COLLISION EXPERT 8930 VENICE BLVD CULVER CITY 90232 4925 Me
15531 PACIFIC BELL 3847 CARDIFF AVE 'CULVER CITY A 90232 ' 4050 isle
18582 %MANSON FURNITURE FINISHING INC 8511 STELLER OR CULVER CITY CA 00232 4060 Me
20048 ANGELUS SHOE POLISH CO 80441NATIQNAL BLVD CULVER CITY C 0252; 4050 [BIN
25200 FANCY CLEANERS 28958 ROBERTSON BLVD LOS ANGELES CA 90034 4050 ndis
45785 CHEVRON DIA, SAMIR I EL-KHOURY 3029 8 ROSEN 1 bON BLVD LOS ANGELES 90034: 4050 mils
55391 DSA PHOTOTECH INC 3383 LIVONIA AVE LOS ANGELES GA 90034 : 4060 MI6
6296470 tetil INC 6649 HAYDEN FL .CULVER CITY CA 90232 , .4050 *Ile
88114 CAMPOS FAMOUS BURRITOS 8885 WASHINGTON BLVD CULVER CITY GA 90232 450 m116
70097 MOBIL DER,FLOR APELES DBA 3071 8 ROBERTSON BLVD LOS ANGELES CA 90034' 40E60 m Ile
72654 • UNI SCH DIST, HAMILTONNIGH SCHOOL 2956 ROBERTSON BLVD . LOS ANGELES A 90034 00.50 mita
761 ; 4 THE CULVER STUMOS 9336 WASHINGTON BLVD CULVER CITY 0 00232 00.30 Ow
89128 UNIVERSAL PROCESS EQUIPMENT INC •3585 HAYDEN AVE CULVER Oily C 90232 40 80 mile
92730 CITY OF CULVER CITY FIRE STATION 1 9000 CULVER BLVD - CULVER CITY C 00232 40.30 mils
96063 GOOD FOOD CATERING & CONSULTING, P WBINK 8549 I-IIGUERA ST CULVER CITY CA 90232 40.60 mire
_
1 05047 HELMS ANTIQUES INC 3231 HELMS AVE LOS ANGELES GA 90034 4030 Mile
5/19/2004 t58 AM
200446
Pag.I of 2|1010|cn
cn
CO
Ul
.11
C71
t . 2
C71
179
1n 1
AC/Mb-listed facilities located within 025 or 0 50 mila of
CD
proposed Park Century &hoot, 3939 Landmark St • Culver City
01
Ca IV119877. EURO COACH, BERNARD COHEN D/3A
120938 ALGER INTERNATIONAL
127426 AVEDIS KALAYOJIAN
132112 DISCUS DENTAL
2588 B ROBERTSON BLVD
98170 NATIONAL BLVD
3040 S ROBERTSON BLVD
8530 HIGUERA ST
LOS ANGELES CA 90034
CULVER CITY CA -90232
•LOS ANGELES . CA
CULVER CrlY 'CA 90232
40 00 mils
415Dmile
40150 mils
40,150 WIG
90034
ACIAi0-listed facilities located within 0 25 or 050 Itt1 le of
proposed Pork Century School 3939 Landmark St , Weer City
'AC . E. r .) kAME
5n912004 8 58 AM
100445|1010|3>|10 10|rn
co Pose 2 of 2
O 1ATTACHMENT NO 9
TRAFFIC STUDY
FOR THE
PARK CENTURY SCHOOL
CULVER CITY, CALIFORNIA
REVISED APRIL 27, 2005
PREPARED FOR
LATHAM & WATKINS LLP
PREPARED BY
Lt L
C91KUASSOCIATESTRAFFIC STUDY
FOR THE
PARK CENTURY SCHOOL
CULVER CITY, CALIFORNIA
Revised April 27 2005
Prepared for
LATHAM & WATKINS LLP
Prepared by
KAKU ASSOCIATES, INC
201 Santa Monica Boulevard Suite 500
Santa Monica California 90401
(310) 458-9916
Ref 1780
C3TABLE OF CONTENTS
I Introduction
Project Description
Study Scope
Organization of Report
II Existing Conditions
Existing Freeway and Street System
Existing Traffic Volumes and Operating Conditions
Existing Public Transit Service
III Future Traffic Projections
Cumulative Base Traffic Projections
Project Traffic Volumes
Cumulative Base Traffic Conditions (Future without Project)
Cumulative Plus Project Traffic Projections
IV Traffic Impact Analysis
Criteria for Determination of Significant Intersection Traffic Impact
Project Impact Analysis
Traffic Mitigation Measures
V Parking Analysis and Pick Up and Drop-Off Analysis
Parking Analysis
Pick-Up and Drop-Off Analysis
VI Regional Transportation System Impact Analysis
CMP Significant Traffic Impact Cntena
VII Summary and Conclusions|1010101010101010|11
15
15
19
25
30
32
32
33
33
39
39
40
50
50
52
References
Appendix A
Appendix B
Appendix C
Appendix D
Intersection Configurations
Traffic Count Sheets
Intersection Level of Service Worksheets and Signal Warrant Analysis
Existing Parking Utilization by Lot — Washington/Landmark Intersection
LHLIST OF FIGURES
NO|109| Study Area and Analyzed Intersections 2|109| Proposed Site Plan 3|109| Existing Peak Hour Traffic Volumes 9|109| Location of Related Projects 18|109| Cumulative Base Peak Hour Traffic Volumes 20|109| Project Trip Distribution (Inbound) 26|109| Project Trip Distribution (Outbound) 27|109| Project Only Peak Hour Volumes 28|1010 9| Cumulative Plus Project Peak Hour Volumes 31
10 Proposed Improvement for Landmark Street & Washington Boulevard
(Remove Fifteen Parking Spaces) 37
11 Existing Site and Parking Lot Circulation 41
12 23 Cars Queuing in the Parking Lot 43
13A Existing School Traffic Queue Diagram with 60 Students 45
13B Year 2008 School Traffic Queue Diagram — Proposed II
with 72/48 Split and 30 Min Separation Between Student Groups 46 1
13C Year 2008 School Traffic Queue Diagram — Alternative 1
with 67/53 Split and 30 Min Separation Between Student Groups 47
13D Year 2008 School Traffic Queue Diagram — Alternative 2
with 70/50 Split and 35 Min Separation Between Student Groups 48
LIST OF TABLES
NO|109| Existing Street Physical Characteristics 7|109| Level of Service Definitions for Signalized Intersections 10|109| Level of Service Definitions for Stop-Controlled Intersections 12|109| Existing Intersection Levels of Service 13|109| Trip Generation Estimates for Related Projects 16|109| School Morning Peak Hour Traffic Patterns 23|109| Project Trip Generation 24|109| Intersection Level of Service Analysis — Future Conditions 29|10 9| Existing Parking Utilization by Quadrant —
Intersection of Washington Boulevard and Landmark Street 35
10 Intersection Level of Service Analysis — Future with Mitigation Conditions 38I INTRODUCTION
This report documents the results of a traffic study conducted by Kaku Associates Inc to
evaluate the potential traffic impact of the proposed Park Century School Project at 3939
Landmark Street in Culver City California This document includes a description of the
assumptions and methods used to conduct the study as well as discussion of the results
PROJECT DESCRIPTION
The project as proposed involves the conversion of an existing industrial warehouse building to
a private elementary school The industrial building is now being used as studio production and
office space
The Park Century School is currently located at 2040 Stoner Avenue in the City of Los Angeles
It serves an enrollment of 60 students with learning disabilities The school will relocate to the
existing industrial building located at 3939 Landmark Street in the City of Culver City Figure 1
illustrates the location of the proposed future school site in relation to the surrounding street
system The school would open with an enrollment of 80 and ultimately serve a student
population of 120 in a combination of required offset start and dismissal times when the school
enrollment exceeds 80 students It is expected that the maximum enrollment of 120 students
would not be reached until 2008 The site plan for the proposed school as shown in Figure 2
includes approximately 47 on site parking spaces of which 16 would be tandem parking
spaces Approximately two thirds of the 47 spaces are designed for regular vehicles and the
other one-third of spaces (i e 13 spaces) are for compact vehicles Student loading and
unloading would take place on-site adjacent to the school building In addition a 20-foot
emergency fire access point with a connection to Lit-1dblade Street is planned at the northwest
corner of the parking lot
L 6
1FIGURE 1
STUDY AREA AND ANALYZED INTERSECTIONS
KAKU ASSOCIATES
(LEGEND
El Project Site
, e' Analyzed intersections
National BIFIGURE 2
PROPOSED SITE PLAN
KAKU ASSOCIATES ------1
/STUDY SCOPE
The study analyzed the potential project-generated traffic impacts on the street system
surrounding the project site The following traffic scenarios were analyzed for the weekday a m
midday school dismissal hour (2 to 3 p m) and p m peak hours
• Existing Conditions (2004) - Analysis of existing traffic conditions provided a basis for the
remainder of the study The existing conditions analysis includes an assessment of
streets traffic volumes and current operating conditions
• Cumulative Base Conditions (2008) - Future traffic conditions without the proposed project
were developed for the year 2008 The objective of this analysis was to project future
traffic growth and operating conditions that could be expected to result from regional
growth and related projects in the vicinity of the project site by the year 2008
• Cumulative plus Project Conditions (2008) - This traffic sc' enano provides projected traffic
volumes and an assessment of operating conditions under future conditions with the
addition of project-generated traffic The potential impacts of the proposed project on
future traffic operating conditions were then identified
Seven intersections were analyzed for the traffic scenarios descnbed above The seven study
intersections shown in Figure 1 are as follows
1 Robertson Boulevard & National Boulevard
2 Exposition Boulevard/Robertson Boulevard & Venice Boulevard
3 Robertson Boulevard/Higuera Street & Washington Boulevard
4 National Boulevard & Venice Boulevard
5 National Boulevard & Washington Boulevard
6 Landmark Street & Washington Boulevard
7 Culver Boulevard & Washington Boulevard/Main Street
The study includes an analysis of potential project impacts on the regional highway and transit
systems in accordance with requirements of the Los Angeles County Congestion Management
Program (CMP)|1010| (fq
Finally the study evaluates the adequacy of the proposed future on-campus parking supply to
accommodate projected campus parking demands Future student pick up and drop-off
procedures and issues of site access for the school were also evaluated
ORGANIZATION OF REPORT
This report is divided into the following seven chapters
• Chapter I presents the preceding introduction
• Chapter ll describes the existing circulation system traffic volumes and traffic conditions
within the study area Chapter II also describes the existing Park Century School access
and circulation system and analyzes existing parking conditions on the campus
• Chapter III describes the methodologies used to develop future cumulative traffic
forecasts and project traffic volumes
• Chapter IV presents an assessment of potential traffic impacts on intersection
operations discusses potential mitigation measures and provides an assessment of
those measures effectiveness
• Chapter V contains an analysis of potential impacts of the project on campus parking
conditions and an evaluation of future pick-up and drop-off procedures and internal
circulation
• Chapter VI contains the results of the Congestion Management Program regional
transportation system impact analysis for the project
• Chapter VII summarizes the conclusions and recommendations of the study|1010|5II EXISTING CONDITIONS
A data collection effort was undertaken to develop analysis of existing transportation conditions
within the study area The preliminary assessment of conditions relevant to this study includes a
description of the street system previous traffic volumes on these facilities and operating
conditions of analyzed intersections
EXISTING FREEWAY AND STREET SYSTEM
As shown in Figure 1 access to the project site would be provided by Landmark Street via
Washington Boulevard Landmark Street is a two-way street with one travel lane in each
direction Washington Boulevard is a major arterial with two lanes in each direction The study
area for this analysis is bounded by Hughes Avenue on the west National Boulevard on the
north Robertson Boulevard on the east and Washington Boulevard on the south
Robertson Boulevard and National Boulevard are the nearest major roadways to the north and
south while Washington Boulevard and Venice Boulevard are the nearest major roadways to
the east and west Regional access to the site is provided by Santa Monica Freeway (I-10)
The Santa Monica Freeway runs east-west less than one-quarter of a mile north of the project
site Access to the Santa Monica Freeway can be obtained via ramps at Robertson Boulevard
National Boulevard and Exposition Boulevard Additional streets serving the project site and the
surrounding study area include Exposition Boulevard Culver Boulevard Higuera Street and
Lindblade Street Table 1 includes a description of the above key roadways in the vicinity of the
site Diagrams of the existing lane configurations at the study intersections are provided in
Appendix A of this report|1010| 5- 1TABLE 1
EXISTING STREET PHYSICAL CHARACTERISTICS
LANES MEDIAN PARKING RESTRICTIONS SPEED
SEGMENT FROM TO NB/WB SB/EB TYPE NB/WB SB/EB LIMIT
Main St/ Bagley Av Washington 61 Venice BI 1 1 DY lhr Meter 8a 6p 1hr Meter 8a-6p -
Venice BI Regent St 1 1 UD PA NSAT -
National BI Bagley Av Robertson B1 1 1 2LT PA NSAT 35
Robertson BI 110 ES On ramp 2 2 2L7 PA NSAT 35
110 ES On ramp Venice 81 2 2 2LT PA PA 35
Venice BI Washington B1 2 2 2L7 10hr Meter 8a 6p 10hr Meter 8a-6p 35
Washington BI Wesley St 2 2 2LT NSAT NSAT 35
Washington BI Wesley St National B1 2 2 2LT 10hr Meter 8a 6p 10hr Meter 8a-6p 35
National BI Higuera $t / Robertson 131 2 2 DY 10hr Meter 8a 6p PA 35
Higuera St / Robertson B1 Inca BI 2 2 2LT 10hr Meter 8a 6p NSAT 35
Inca 81 Culver B1 2 2 RM NSAT NSAT 35
Culver BI Cardiff Av 2 3 RM 2hr Meter 8a 6p NSAT 35
Cardiff Av Hughes Av 2 2 RM NSAT 2hr Meter 8a 6p 35
Higuera St / Robertson BI Krueger St Lindblade St 1 1 SY PA PA 25
Lindblade St Washington BI 1 1 DY NSAT 2hr Meter 8a 6p 25
Washington 61 Venice 81 2 2 2LT NSAT 2hr Meter 8a 6p n/a
Venice BI 110 WB On ramp 2 One Way One Way LZ + 30 min 8a lap NSAT n/a
110 WB On ramp Ellis Av 1 2 DY NSAT NSAT -
Ellis Av National B1 2 2 RM PA PA n/a
National B1 110 WB Off ramp 2 2 2LT PA PA 35
Exposition B1 Livonia Av 110 ES Off ramp
_
1 1 UD PA PA 35
110 ES Off ramp Venice 131 One Way 4 One Way North Side PA South Side NSAT 35
Venice BI Washington BI 1 1 UD PA PA n/a
Lindblade St Inca 131 Higuera St One Way 1 n/a 10hr Meter 8a-6p 10hr Meter 8a-6p n/a
Higuera St end of street 1 1 UD 10hr Meter Ba-6p PA n/a
Landmark St Washington BI end of street 1 1 UD 2hr Meter 8a 6p 2hr Meter ea 6p n/a
Venice 131 Helms Av Curtis Av 3 3 RM 2hr Meter 8a 6p 2hr Meter 83 6p 35
Curtis Av National 131 3 3 RM PA 2hr Meter ea 6p 35
National B1 Ellis Av 3 3 RM 1hr Meter 8a 6p 1hr 8a 6p 35
Ellis Av Robertson BI 3 3 RM NS 4p 7p 1hr ea 6p 35
Robertson BI Culver 131 3 3 RM N$AT 1hr 8a 6p 35
Culver BI Hughes Av 3 3 RM 1hr Meter 8a 6p 1hr Meter 8a-6p 35
Culver BI Venice 81 Ince 131 2 2 RM NSAT NSAT 35
Ince BI Main St 2 2 RM 2hr Meter 8a 6p 2hr Meter 8a 6p 35
Washington BI Lafayette PI 2 2 RM 2hr Meter 8a 6p NSAT 35
Lafayette PI Duquesne Av 2 2 RM 2hr Meter ea 6p _ 2hr Meter ea 6p 35
Notes
LANES # - Number of lanes
MEDIAN TYPE 2LT Two Way Left Turn Lane
RM Raised Median
UD - Undivided
$Y Single Yellow Line
PARKING PA Parking allowed
NPAT - No parking anytime
NSAT No stopping anytime
Meter Metered Parking
12 - Loading Only ZoneEXISTING TRAFFIC VOLUMES AND OPERATING CONDITIONS
The following sections present the existing peak hour turning movement traffic volumes at the
study intersections a description of the methodology used to analyze intersection operating
conditions and the resulting level of service at each location under existing conditions
Existmq Peak Hour Traffic Volumes
Weekday morning (7 to 9 a m) midday (2 to 4 p m) and afternoon (4 to 6 p m) peak period
traffic counts were collected at the seven study intersections in September and October 2004
These weekday traffic volumes illustrated in Figure 3 represent existing 2004 conditions for the
purposes of this analysis Appendix B contains the detailed traffic count data
Intersection Level of Service Standards and Methodology
Level of service (LOS) is a qualitative measure used to describe the condition of traffic flow
ranging from excellent conditions at LOS A to overloaded conditions at LOS F LOS D is
typically recognized as the minimum acceptable service level in urban areas Of the seven
analyzed intersections, six intersections are currently controlled by traffic signals The
intersection of Landmark Street and Washington Boulevard is stop-controlled on the northbound
approach Four of the seven intersections are located within the jurisdiction of the City of Culver
City including Roberson Boulevard/Higuera Street & Washington Boulevard National Boulevard
& Washington Boulevard Landmark Street & Washington Boulevard and Culver Boulevard &
Washington Boulevard/Main Street The remaining three intersections fall within the jurisdiction of
the City of Los Angeles
The Intersection Capacity Utilization (ICU) method of intersection analysis was used to
determine the intersection volume-to-capacity (V/C) ratio and corresponding level of service for
the given turning movements and intersection characteristics at the three signalized
intersections located in the City of Culver City A capacity of 1 600 vehicles per lane per hour
was assumed in the capacity calculations with a clearance interval of 0 10 Table 2 defines the|1010| 9NOT TO SCALE
T'9,•cieo*
'RTA6;i96>
‘'?
6;6006)
t.53
gy,cP,4350
t-
215(55)(ssi
Ac3Land
mark
St
APZ‘v%
Pezt>
KAKU ASSOCIATES
Project Site
AM(MID)(PM] Peak Hour Traffic Volumes
(Rounded to the Nearest Five Vehicles)
te-ep
*e-ei
National BI
4)06.
FIGURE 3
EXISTING PEAK HOUR TRAFFIC VOLUMES
JarTABLE 2
LEVEL OF SERVICE DEFINITIONS FOR SIGNALIZED INTERSECTIONS
Level of Service
Volume/Capacity
Ratio Definition
A 0 000 0 600 EXCELLENT No Vehicle waits longer than one red
light and no approach phase is fully used
B 0 601 -0 700 VERY GOOD An occasional approach phase is
fully utilized many drivers begin to feel somewhat
what restricted within groups of vehicles
C 0 701 0 800 GOOD Occasionally drivers may have to wait
through more than one red light backups may
develop behind turning vehicles
D 0 801 0 900 FAIR Delays may be substantial during portions
of the rush hours but enough lower volume periods
occur to permit clearing of developing lines
preventing excessive backups
E 0 901 1 000 POOR Represents the most vehicles intersection
approaches can accommodate may be long lines
of waiting vehicles through several signal cycles
F > 1 000 FAILURE Backups from nearby locations or on
cross streets may restrict or prevent movement of
vehicles out of the intersection approaches
Tremendous delays with continuously increasing
queue lengths
Source Transportation Research Board
10
;-'11
ranges of V/C ratios and corresponding level of service for signalized intersections The three
intersections located in the City of Los Angeles were evaluated using the Critical Movement
Analysis (CMA) method as required by the City of Los Angeles The CALCADB software
package developed by Los Angeles Department of Transportation (LADOT) was used to
implement the CMA method at these three intersections
All six signalized intersections are currently controlled by the City of Los Angeles Automated
Traffic Surveillance and Control (ATSAC) system In accordance with LADOT procedures a
capacity increase of 7% (0 07 V/C adjustment) was applied to reflect the benefits of ATSAC
control at the six signalized intersections
The Two Way Stop-Controlled methodology from the 2000 Highway Capacity Manual was
used to determine the average vehicle delay (in seconds) and the corresponding level of service
for the stop-controlled study intersection of Landmark Street & Washington Boulevard The
level of service definitions for the stop-controlled intersection are summarized in Table 3
Existing Peak Hour Intersection Levels of Service
The existing traffic volumes presented in Figure 3 were analyzed using the intersection capacity
analysis methodology described above to determine the current operating conditions at the
seven study intersections Table 4 summarizes the existing weekday morning peak hour
midday peak hour and afternoon peak hour V/C ratio and corresponding level of service at the
analyzed intersections As indicated in Table 4 three of the seven study intersections in the
vicinity of the project site are currently operating at an acceptable level of service i e LOS D or
better in all three analyzed peak periods
EXISTING PUBLIC TRANSIT SERVICE
Existing public transit services that operate in the project area include bus routes of Los Angeles
County Metropolitan Transportation Authority (MTA) system LADOT Commuter Express
services the Culver City Bus system and the Santa Monica City Big Blue Bus systemTABLE 3
LEVEL OF SERVICE DEFINITIONS FOR STOP CONTROLLED INTERSECTIONS
Level of Service
Control Delay
(seconds/vehicle)
A
.c. 10 0
B
> 10 0 and 5. 15 0
C
> 15 0 and 250
D
> 25 0 and 350
E
> 35 0 and :s 50 0
F
> 50 0
Source Transportation Research Board Highway Capacity Manual 2000
12
c-7TABLE 4
EXISTING INTERSECTION LEVELS OF SERVICE
No INTERSECTION
PEAK
HOUR
EXISTING
V/C or Delay LOS
1* Robertson BI & National B1 A M 0 863 D
MID 0 844 D
PM 0 914 E
2* Exposition 61/Robertson BI & Venice BI AM 1 003 F
MID 0 882 D
PM 0 998 E
3* Robertson BI/Higuera St & Washington 61 A M 0 746 C
MID 0 535 A
PM 0 630 B
4 National B1 & Venice BI AM 1 110 F
MID 0 958 E
PM 1 018 F
5 National BI & Washington 61 A M 0 858 D
MID 0 608 B
PM 0 799 C
6 Landmark St & Washington BI [a] AM
*.
F
MID 69 F
PM 72 F
7* Culver BI & Washington BI/Main St [b] A M 0 783 C
MID 0 583 A
PM 0 736 C
Note
[al Intersection is controlled by stop signs Average vehicular delay in seconds is reported rather than V/C ratio
[b] Field observation at this location has indicated worse traffic conditons than the projected LOS C or better during the three analyzed peak
periods The projected good level of servies were resulted from the undercounted traffic volumes at this intersection when the majority of the
cars were caught in the downstream or the upstream bottlenecks at Culver Boulevrad Washington Boulevard Watseka and Irving Place
However this projected good level of service would not affect the determination of whether this intersection is significantly impacted As the
incremental change in the V/C ratios due to the project traffic is 0 005 or less (as shown in Table 8) so the intersecion would not be impacted
even if the projected level of service were E or F
Intersections are controlled by ATSAC system A credit of 0 07 in v/c ratio was included in the above analysis
Overflow condition indicating oversaturated conditions for long periods Average vehicle delay cannot be calculatedThe following illustrates these routes and their peak hour frequencies during morning (7 to 9
a m) and afternoon (4 to 6 p m ) peak periods
• LACMTA 220 - Line 220 is a north south local service that primarily travels along
Robertson Boulevard Culver Boulevard Pershing Drive and Imperial Highway
connecting West Hollywood and Los Angeles International Airport In the vicinity of the
project this line travels along Robertson Boulevard National Boulevard Venice
Boulevard and Culver Boulevard Line 220 has an average headway of 60 minutes
throughout the day
• LACMTA 333/33 - Line 33/333 is an east-west local service that travels along Venice
Boulevard connecting Santa Monica and downtown Los Angeles In the vicinity of the
project this line serves stops on Venice Boulevard Line 33/333 provides an average
headway of 15 minutes during the peak hours
• LADOT CE437 - This LADOT commuter express line serves the cities of Venice Manna
Del Rey Mar Vista and Culver City It travels along Santa Monica Freeway (1-10) and
connects them with downtown Los Angeles In the vicinity of the project this line travels
along Washington Boulevard and Culver Boulevard This line provides average a m and
p m peak hour headways of 25 minutes and 30 minutes respectively
• Culver CityBus Line 1 — Line 1 travels primarily along Washington Boulevard and Pacific
Avenue and connects the Venice Beach area Culver City area and the West Los
Angeles transit center In the vicinity of the project this line has stops on Washington
Boulevard with 15 minute headways throughout the day
• Culver CityBus Line 4 - Line 4 provides service in the north-south direction between the
West Los Angeles Transit Center at Washington Boulevard and Fairfax Avenue and the
Fox Hills Mall on a route that includes Washington Boulevard Duquesne Avenue
Jefferson Boulevard Sepulveda Boulevard Bristol Parkway and Hannum Avenue Line
4 has stops on Washington Boulevard in the vicinity of the project site Line 4 is
operated on an hourly basis on weekdays only
• Culver CityBus Line 5 - Line 5 provides service in the northeast-southwest direction
between Blair Hills and Mar Vista In the vicinity of the project site it travels along
Higuera Street Washington Boulevard and Culver Boulevard This line is operated on
an hourly basis on weekdays only
• Santa Monica Line 12 — Line 12 serves the communities of West Los Angeles Culver
City Palms and the Westwood area In the vicinity of the study area this line travels
along National Boulevard and Venice Boulevard This line provides 15-minute
headways throughout the day
14
riIII FUTURE TRAFFIC PROJECTIONS
In order to evaluate properly the potential impacts of the proposed project on the street system
it was necessary to develop estimates of future traffic conditions in the study area both with and
without the project Future traffic volumes were first estimated for the study area without the
project These future forecasts reflect traffic increases due to general regional growth and traffic
expected to be generated by other specific developments in the vicinity of the project and
represent cumulative base (no project) conditions Incremental project traffic was then
estimated and separately assigned to the surrounding street system The sum of the
cumulative base and project-generated traffic represents the cumulative plus project conditions
Development of each of these future traffic scenarios is described in this chapter
CUMULATIVE BASE TRAFFIC PROJECTIONS
Regional Growth and Related Projects
The cumulative base traffic projections reflect growth in traffic over existing conditions from two
sources growth in the existing traffic volumes to reflect the effects of overall regional growth
and development outside the study area and traffic generated by specific projects located
within or in the vicinity of the study area
Existing traffic volumes was adjusted by a growth factor of 1% per year to reflect changes in
regional growth and development in the between 2004 and 2008 This results in a projected
adjustment of 4% over existing conditions The second element in the development of the
cumulative base traffic forecasts is the consideration of the effects of specific projects in the
vicinity of the project study area The list of these related projects were obtained from the Cities
of Los Angeles and Culver City and Los Angeles County A total of 36 related projects were
identified as shown in Table 5 The locations of these related projects are shown in Figure 4
(A
15TABLE 5
TRIP GENERATION ESTIMATES FOR RELATED PROJECTS
Map
108 Project Desc pt o Location Da Iv Trios
AM Peak Hour Tnps PM Peak Hour Trips Midday Peak Hour Trips
In Out Total In Out Total In Out Total
—
City of Cut or City
1 New office and retail building [IA 9 000 SQ ft office building 4447 Sepulveda BI 99 12 2 14 2 11 13 0 1 1|1010|L
Baldwin Hills Scenic Overlook
P °Int [b) passive recreation and parhing
Hetzle Rd 265 2 1 3 s 7 12 4 5 9
3 Offce B Id g [b) Co sirucl a of 151 000 sq ft cffce bu Id |10 10|3505 Hayden A 1 663 208 28 236 38 187 225 4 19 23
4 School building expans on [6]
Bu Id ng expansion (net increase of 8 352 sq ft (and an
nc ease 0140 students
3430 McManus Av N/A 19 11 30 0 0 0 11 19 30
5 SPE Tele sion Building lb) Approximately 27 000 sq ft office build ng 9050 Wash ngton BI 297 37 5 42 7 33 40 1 3 4
6 Chevron Gas Stat on [b)
Relocate the car wash facility and construction of a new
2 000 sq ft convenience store
10649 Jefferson Bi
N/A 79 76 155 96 96 192 72 72 144
7 Culver City Commerce Center [6] 242 950 sq ft office/industnal fad ty with tandem parking 10100 Jefferson BI 2 626 333 45 378 60 292 362 6 29 35
8 Vehicle Repair Shop [6] 1 150 sq ft auto repair shop and used car sales 11304 Culver 61 N/A 2 1 3 2 2 4 2 2 4
9 Retail/ Commercial [131 2 125 sq ft retail bu Id ng 5530 Sepulveda BI 573 10 6 16 24 26 50 18 20 38
10 Residential Condominiums [c] Four unit condominium 4071-4073 La Fayette PI 42 4 1 5 3 1 4 2 1 3
11 M ed Use De elopment [b)
25 969 sq ft two story office building with 8 livetwork
units, a small studio and coffee house
8601-8637 Wash ngto BI 471 56 8 64 18 90 108 12 59 70
[12 Ullman Res dence (b) Addition of a third unit loan existing two bedroom duplex 4070 Madison Av 7 0 1 1 1 0 1 1 0 1
13 Res dent al Development OA
Demol sh two e st g s gle ram ly houses adjust the lot
I ne to c eate a larger lot and develop Bunt apartment
build q
4210 Duquesne A 28 1 6 7 15 8 23 10 5 15
14 Welk [b) 40 000 sq ft of new off ces 9699 Jefferson BI 440 55 7 62 10 50 60 1 5 6
15 Culver City Muffler Shop [b] 2 500 sq fl car repair facility 11333 Washington Ell N/A 5 3 8 4 4 13 3 3 6
16
Baldwin H Ils Rego al Park
Maste Plan project [b)
De elopment of a 38 acre park Stocker St 174 1 1 2 4 4 8 3 3 6
17 i< rk Douglas Theat e [b) Reno at o of the forme Cul er Theatre 9820 Wash gton 61 6 089 0 o o 452 29 481 339 22 361
18
Wind Swept Parcel Map/Single
Family [b]
Construct on of fou res dential un Is on 4 new parcels 4227 Inca 61 38 1 2 3 3 1 4 2 1 3
19 Culver City Transfer Station [b] Increased throughput from 500 tpd to 1056 tpd 9255 Jefferson BI N/A 12 5 17 3 14 17 2 11 13
20 Mixed Use Development (b)
6 411 sq ft m xed use project cons sting of three reta I
spaces and three (Iwo bedroom two bath) apartment us Is
on the second floor
11511 Washington BI 150 0 1 1 5 6 11 4 5 9(CONTINUED)
TABLE 5
TRIP GENERATION ESTIMATES FOR RELATED PROJECTS
Map
ID# Protect Descnphon Location Daily Trips
AM Peak Hour Trips PM Peak Hour Trips Midday Peak Hour Trips
In Out Total In Out Total In Out Total
City of Culver City
21
Jeffrey Palmer Property
OffiCe/Industnal Condos lb
29 986 sq ft commercial condos 3525 Eastham Dr 270 33 4 37 6 31 37 1 3 4
Max Leather AUP (Clothing
Apartment Building (b)
Child Development Center [bi
Condo (b)
K9t;fifiPZftTYxv 111
Lin versity of Phoenix Training
Center
Removal of existing 25 000 sf office use and construction
of new Ira n ng center to accommodate up to 100 students
in day t me classes and 300 students in evening classes
200 300 Corporate Pointe 85 40 11 51 167 66 233 17 7 24
City of Los Angeles
30 Shopping Center (D) 132 802 sq ft shopping center 8985 Venice BI 5 700 83 53 136 238 258 496 179 194 372
31 Office Bu Ming [a) 45 712 sq ft office building 8787 Venice BI 503 62 e 71 12 56 68 1 6 7
32
MTA Division 6 West Los
Angeles Transit Center on NI
Transportation Center for operations and maintenance
fac I ty fo up to 175 MTA buses and assoc sled
admIn strat ye staff
Jefferson 131 1 666 67 40 107 77 26 103 8 3 11
33 Apartment (a) construct 118 un t apartme Is with 206 parking spaces 10001 Ven ce BI 782 10 50 60 39 19 58 25 12 37
34 Private School [a)
construct a pnvate school for pre K to 5th grade with
42,000 stand 44 parking spaces
9051 Pico BI 333 57 47 104 48 54 102 47 57 104
35
Say On Drugstore w/Dnve
through (a)
Construct Say-On drugstore with dnve through pharmacy
and alcohol sales for off site consumption
3563 La B ea Av 1 480 26 19 45 51 54 105 39 40 79
County of Los Angeles
36
West Los A geles College
Master Plan Project [13(
Proposed Master Plan for the College to increase the
student enrollment from current 10 312 to 15 124
students by year 2015 anticipated enrollment growth
through 2008 used for trip go oration for purposes of this
study
Overland Ay/ Freshman Dr 17 367 f117 115 1 232 767 341 1 108 575 256 831
Totals 46 738 3 029 673 3 702 2 308 2 402 4 710 1 421 959 2 383
ffStsL
(aj Tnp Generation Estimates were provided by LADOT staff (including daily taps and total peak hour taps)
Directional Distnbution is based on ITE Trip Generation 7th Edition 2003
Ebj Source Kaku Associates Traffic Study for the West Los Angeles College September 2004
(c)Sou ce Kaku Associates Traffic Study fo the Symantec Office Development Project July 2004
(d)Weekday m dday peak hou tnps assumed a pe centage of PM peak hour tnps reta I 75% reside t al 65% off ce 10 / Sources on these pe centages were from the following Hourly Vanat on n Shopp ng Center Traffic
ITE Tap Generation 7th Edition and Traffic Analysis for 8601 Wilshire Boulevard Involving 24-hour count distnbutionKAKU ASSOCIATES
FIGURE 4
LOCATION OF RELATED PROJECTSTrip Generation Trip generation estimates were developed using trip generation rates
contained in Tnp Generation 7Th Edition (Institute of Transportation Engineers 2003) The
relevant trip generation estimates are summarized in Table 5 A shown in Table 5 the related
projects are projected to generate a total of 46 738 daily trips of which approximately 3 702
tnps occur during the morning peak hour 2 383 during the midday peak hour and 4 710 during
the afternoon peak hour
Trip Distribution The geographic distribution of the traffic generated by the cumulative
projects depends on several factors These factors included the type and density of the
proposed land uses the geographic distribution of population from which the employees and
potential patrons of the proposed developments are drawn and the location of these related
projects in relation to the surrounding street system Using the factors mentioned the
distnbution patterns were developed and used for the related projects
Trip Assignment Using the trip generation estimates and trip distribution patterns described
above traffic generated by the related projects was assigned to the street network Future base
traffic volumes were then added to the existing traffic volumes after the adjustment for areawide
growth to represent cumulative base conditions (i e future conditions without the proposed
reconfiguration project) which are illustrated in Figure 5
PROJECT TRAFFIC VOLUMES
The development of traffic generation estimates for the proposed project involves the use of a
three-step process similar to that discussed above for the cumulative projects including traffic
generation trip distribution trip distribution and traffic assignment
Protect Trip Generation
To develop existing school traffic volumes manual turning movements counts were collected at
the existing school driveways on Stoner Avenue during the morning drop offs from 8 to 9 a m
and on Friday during the one-time midday dismissal hour from 2 to 3 p m (which is the only
weekday when the entire school is dismissed at the same time) Both counts were conducted in
cH
19LEGEND
r-1 Project Site
#(#)(#] AM(MID)(PM] Peak Hour Traffic Volumes
(Rounded to the Nearest Five Vehicles)
NOT TO SCALE
"
cacA.V‘
cP"44*
A431,4('
C-20(44,71
Land
mark
St
(*StNp n /.%
4 )(3$ ' 38
t+43
14ss 6;:e19,-66.
°(‘' (67ol|1010|KAKU ASSOCIATES }
National BI
FIGURE 5
CUMULATIVE BASE PEAK HOUR TRAFFIC VOLUMESJune 2004 With the current enrollment of 60 students and 36 staff members (33 on-site), the
school generated 124 morning peak hour trips (74 inbound 50 outbound) from 8 to 9 a m and
92 midday peak hour trips (42 inbound 50 outbound) Future school trip generation during the
afternoon peak hour (4 to 5 p m) was estimated based on the trip generation rates/equations
for a 120-student private school from ITE s Trip Generation 7th Edition
The existing school tnp generation was then factored proportionally to reflect future trip
generation for the 120 students and 47 staff estimated to be present by year 2008 without any
consideration of an offset in the arrival and dismissal schedule This resulted in 625 daily tnps,
including approximately 225 morning peak hour trips (127 inbound 98 outbound) and 180
midday peak hour trips (84 inbound 96 outbound)
When the school enrollment exceeds 80 students a proposed offset school schedule would be
introduced to students and staff to divide them Into three groups Group 1 with 47 staff only
Group 2 with 72 students and Group 3 with 48 students Due to the changes in school traffic
arrival patterns, future school trip generation during the morning peak periods would be greatly
reduced as described below
School hours are currently from 8 30 a m to 2 p m from Monday to Thursday and 9 a m to 2 30
p m on Friday The current school arnval pattern (with 60 students and 36 staff) during the
morning peak hour was developed based on the five-minute counts from 7 30 to 9 30 a m at the
existing school site at 2040 Stoner Avenue on Wednesday June 2 2004 As shown in Table 6A
a total of 74 inbound and 50 outbound vehicles were observed to access the school site dunng
the school s morning peak hour from 8 to 9 a m With scheduled school start time at 8 30 a m
approximately 58% of the 74 peak hour inbound trips arrived before the start time and 42%
arnved later than 8 30 a m Approximately 52% of the 50 peak hour outbound vehicles dropped
off their students and left before 8 30 a m and 48% left later than 8 30 a m The existing school
inbound and outbound trip estimates during the morning peak hour were then factored
proportionally to develop future school traffic arrival patterns for the 120 students and 47 staff
estimated to be present by year 2008 as shown in Table 6B (for future conditions without the
staggered schedule) The resulting school trip generation without the offset start and stop
schedule was estimated to be 129 inbound and 98 outbound trips during the morning peak hour
from 8 to 9 a m
CoL
21With the implementation of the staggered school schedule 47 staff members (Group 1) would
start at one time (8 a m) during the morning peak hour and students would be divided into two
groups with scheduled start times for 72 students at 8 15 a m (Group 2) and for the other 28
students at 8 45 a m (Group 3) As shown in Table 6C with the application of the existing school
arrival pattern (arnval percentages based on five-minute counts indicated in Table 6B) individually
to each group future school arrival patterns were developed for Group 1 Group 2 and Group 3
Similarly existing school departure patterns (departure percentages) shown in Table 6B for
school outbound vehicles after drop offs were applied individually to the two student groups
Future outbound traffic generated by the staff members dunng the morning peak period would be
minimal
The sum of the school inbound and outbound trips from all three groups during the morning peak
hour represents new school peak hour trip generation estimates As indicated in Table 6C the
school would generate an estimated 101 peak hour inbound trips and 89 peak hour outbound trips
dunng the typical morning peak periods from 7 to 9 a m
The new school trip generation for the three school peak periods with the schedule offset is
summanzed in Table 7 As indicated under future conditions in year 2008 with the ultimate
enrollment of 120 students and 47 staff the school is projected to generate approximately 625
daily trips including approximately 190 trips during the a m peak hour (101 inbound 89
outbound) from 7 50 to 8 50 a m Under these same conditions the school is projected to
generate approximately 180 trips during the midday school dismissal hour from 2 00 to 3 00
p m (84 inbound 96 outbound) and 20 trips during the p m peak hour (nine inbound 11
outbound)
Credit was taken for the existing land use on the project site currently in operation that would be
replaced by the proposed project The existing land use is a studio production and office
building with an area of 37 000 square feet Data collection to develop the peak period traffic
volumes for this office building was conducted at the building access driveway on Landmark
Street in June 2004 As shown in Table 7 the land use to be removed currently generates
approximately 28 morning peak hour trips (21 inbound seven outbound) 28 midday peak hour
trips (14 inbound 14 outbound) and 45 afternoon peak hour trips (17 inbound 28 outbound)
22
67TABLE 6
SCHOOL MORNING PEAK HOUR TRAFFIC PATTERNS
a EXISTING SCHOOL TRAFFIC PATTERN
With 60 students and 36 staff
Period Inbound / Inbound Outbound / Outbound
8 00 8 05 5 7/ 2 4/
8 05 8 10 4 5/ 3 6/
8 10 8 15 5 7/ 3 6/
8 15 8 20 9 12/ 3 6/
8 20-8 25 7 9/ 4 8/
8 25 8 30 13 18/ 10 20/
8 30 8 35 12 16/ 14 28/
8 35 8 40 a 11/ 7 14/
8 40 8 45 2 3/ 1 2/
8 45-8 50 1 1/ 1 2/
8 50 8 55 2 3/ 0 0/
8 55 9 00 6 8/ 1 2/
SUM 74 100/ 50 100/
T RE SCHOOL TRAFFIC PATTERN WITHOUT STAGGERED SCHEDULE
With 120 students and 47 staff
Penod Inbound / Inbound Outbound / Outbound
8 00 8 05 9 7/ 4 4/
8 05 8 10 7 5/ 6 6/
8 10 8 15 9 7/ 6 6 /9
8 15 8 20 16 12/ 6 6/
8 20 8 25 12 9/ 8 8/
8 25 8 30 23 18/ 20 20/
8 30 8 35 21 16/ 28 29/
8 35 8 40 14 11/ 14 14/
8 40-8 45 3 3/ 2 2/
8 45 8 50 2 1 / 2 2/
8 50-8 55 3 3/ 0 0/
8 55 9 00 10 8/ 2 2/
SUM 129 174/ 98 196/
Source Sleob erv lion from 7 30 a m to 30a m o Jun 2 2004at2040510 e Ac Los A gales
cI FUTURE SCHOOL TRAFFIC PATTERN WITH PROPOSED STAGGERED SCHEDULE
Group One 47 staff Group Two 72 students Group Threu 48 students Sum of Three Groups I
Period Inbound Outbound Inbound Outbound Inbound Outbound Inbound Outbound
7 30 7 35 2 0 2 0
7 35 7 40 2 0 2 0
7 40 7 45 2 0 2 0
7 45 7 50 4 0 4 2 8 2
7 50 7 55 3 0 3 4 6 4
7 55 8 00 6 0 4 4 10 4
8 00 8 05 6 0 7 4 12 4
8 05 8 10 4 0 5 5 9 5
810-8 15 1 0 9 12 10 12
'8 15-8 20 0 0 9 17 3 2 12 19
8 20 8 25 1 0 6 8 2 2 9 11
8 25 8 30 3 0 1 1 3 2 6 4
8 30 8 35 1 1 5 2 5 4
8 35 8 40 1 o 4 3 5 3
8 40 8 45 4 1 7 a 11 9
8 45-8 50 a 11 6 11
8 50 8 55 4 6 4 6
8 55 9 00 1 1 1 1
9 00 9 05 1 1 1 1
9 05 9 10 1 0 1 0
9 10 9 15 3 1 3 1
School-only Peak Hour Trip Generation Estimates
Period Inbound Outbound Total
7 30 8 30 69 64 153
7 35 8 35 92 68 160
7 40 8 40 95 71 166
7 45-8 45 103 80 183
7 50 8 50** 101 89 190
7 55 8 55 99 91 190
8 00 9 00 90 88 176TABLE 7
PROJECT TRIP GENERATION
Land Use
Size Daily
AM Peak Hour
(7 50 8 50 a m )
Midday Peak Hour
(2 00 3 00 p m )
P M Peak Hour
(4 15 5 15 p m )
IN OUT TOTAL IN OUT TOTAL IN OUT TOTAL
PROPOSED PROJECT Protect condition
Park Century School [1] 47 staff @ 8 00 a m Start 625 101 89 190 84 96 180 9 11 20
72 students @ 8 15 a m Start
48 students
@
845 a m Start
Total New Uses
625 101 89 190 84 96 180 9 11 20
EXISTING USE TO BE REMOVED
37 KSF 260 21 7 28 14 14 28 17 28 45
studio production and office space [2]
Total Existing Uses
260 21 7 28 14 14 28 17 28 45
TOTAL NET PEAK HOUR TRIPS 365 80 82 162 70 82 152 8 17 25
Note
[1] Project trip generation for A M peak was developed based on the site observation from 7 30 a m to 9 30 a m on June 2 2004 and required project condition with
staggered school start time for 47 staff at 8 00 a m 72 students at 8 15 a m and 48 students at 8 45 a m Project trip generation for midday peak hour was developed
based on the counts obtained from the equivalent one time dismissal at noon on June 11 2004 (which represents the worst scenario under future conditions) Project trip
generation for P M peak hour was obtained based on ITE 7th Edition (Land use code 536 Private School (K 12))
[2] A M and P M peak hour trip generation for existing land use was obtained from site observation from 7 a m to 9 a m and from 2 p m to 6 p m on July 26 2004The proposed Park Century School conversion project would generate 365 net daily trips which
includes approximately 162 morning peak hour trips (80 inbound 82 outbound) and 152 midday
peak hour trips (70 inbound 82 outbound) The proposed conversion project would also improve
the afternoon peak hour traffic conditions at the study intersections as the school would produce
eight inbound trips and 17 outbound trips fewer than the existing office use
Project Traffic Distnbution/Assiqnment
The distribution of net trips generated by the proposed Park Century School project was first
developed based on the zip code list of the current student and staff provided by the school The
previously developed school traffic pattern was then adjusted with the consideration of potential
new enrollments given the geographical distnbution of employment business and shopping
opportunities in which the parents might participate after dropping off/picking up their students at
school and the location of the project in relation to the surrounding street system The overall
distribution pattern used for this project was
• 25% to/from the north
• 25% to/from the east
• 20% to/from the south
• 30% to/from the west
Figures 6 and 7 illustrate the proposed project tnp inbound and outbound distribution
respectively The net trips generated by the proposed project were assigned to the street system
and Figure 8 illustrates the traffic generated by the proposed project during the morning and
afternoon peak hour at the seven analyzed intersections
CUMULATIVE BASE TRAFFIC CONDITIONS (Future without Project)
The year 2008 cumulative base peak hour traffic volumes illustrated in Figure 5 were analyzed
to determine the V/C ratio and LOS at the seven analyzed intersections for without-project
conditions The results are summarized in Table 8 Based on the criteria established by the
25,j *a
Project Site
XX% Percentage of Inbound Trips
KAKU ASSOCIATES -}
FIGURE 6
PROJECT TRIP DISTRIBUTION (INBOUND)I ca I Dts
a i
of
0,0gtoIN'
10 %----n
Landmark St
cyo
94,
N
s,
LEGEND
0 Project Site
XX% Percentage of Outbound Tnps
KAKU ASSOCIATES -j
National BI
cr
.4_5 0 70 0
0:7
c
el()
4>ce
FIGURE 7
PROJECT TRIP DISTRIBUTION (OUTBOUND)4?)
NOT TO SCALE
Ncsb:01*
Yir 494?,
Nc5e.z,*.
\93
t- 41(444j
r• IN iz41
Landmark St
(F.EGEND
F7-1 Project Site
#(#)[#] AM(MID)[PM] Peak Hour Traffic Volumes
KAKU ASSOCIATES
Nabonal BI
FIGURE 8
PROJECT ONLY PEAK HOUR VOLUMESTABLE 8
PARK CENTURY SCHOOL PROJECT
INTERSECTION LEVEL OF SERVICE ANALYSIS FUTURE CONDITIONS
CUMULATIVE CUMULA11VE PLUS Project
JURIS PEAK BASE (2008) PROJECT VIC Significant
No INTERSECTION DICTION HOUR V/C LOS V/C LOS Change Impact?
1 Robertson SI& National BI Los Angeles [a] AM 0 925 E 0 931 E 0 006 NO
MID 0 901 E 0 905 E 0 004 NO|1010|PM 0 988 E 0 987 E 0 001 NO
2 Exposition BI/Robertson BI & Venice BI Los Angeles [a] AM 1 163 F 1 170 F 0 007 NO
MID 0 982 E 0 990 E 0 008 NO
P M 1 249 F 1 249 F 0 000 NO
3 Robertson BI/Higuera St & Washington Bi Culver [b] AM 0 820 o 0 833 D 0 013 NO
MID 0 586 A 0 615 B 0 029 NO
PM 0 694 B 0 688 B 0 006 NO
4 National BI & Venice BI Los Angeles [a] AM 1 213 F 1 219 F 0 006 NO
MID 1 066 F 1 070 F 0 004 NO
PM 1 193 F 1 192 F 0 001 NO
5 National BI & Washington BI Culver [b] AM 0 938 E 0 957 E 0 019 NO
MID 0 640 B 0 653 B 0 013 NO
PM 0 860 D 0 858 D 0 002 NO
6 Landmark St & Washington 81 [b] Culver [b] A M F F
MID F F
PM F F
AM 0 729 0 790 0 061 YES
MID 0 514 0 596 0 082 YES
P M 0 586 0 575 0 011 NO
7 Culver BI & Washington BVMain St [c] Culver [b] AM 0 823 D 0 828 D 0 005 NO
MID 0 643 B 0 647 B 0 004 NO
PM 0 839 D 0 839 D 0 000 NO
Note
[a] According to LADOT's cntena a project impact would be considered significant If the following conditions are met
Conditions with Protect Traffic proiect related Increase in V/C Ratio
LOS V/C ratio
0 701 to 0 800 Equal to or greater than 0 040
0 801 to 0 900 Equal to or greater than 0 020
E F 0 901 or more Equal to or greater than 0 010
[b] According to Culver City s criteria a project impact would be considered significant if the following conditions are met
Conditions with Protect Traffic Prolect related Increase in V/C Ratio
LO V/C ratio
0 801 to 0 900 Equal to or greater than 0 040
E F 0 901 or more Equal to or greater than 0 020
[c] Field observation at this location has indicated worse traffic condffons than the projected LOS C or better during the three analyzed peak periods The
projected good level of servies were resulted from the undercounted traffic volumes at this intersection when the majority of the cars were caught in the
downstream or the upstream bottlenecks at Culver Boulevrad Washington Boulevard Watseka and Irving Place However this projected good level of
service would not affect the determination of whether this intersection is significantly impacted As the incremental change in the V/C ratios due to the project
traffic is 0 005 or less so the intersecion would not be impacted even if the projected level of service were E or F
Intersections are controlled by ATSAC system A credit of 0 07 in v/c ratio was included In the above analysis
Overflow condition indicating oversaturated conditions for long penods Average vehicle delay cannot be calculatedCities of Los Angeles and Culver City two of the seven intersections are projected to operate at
acceptable level of service (LOS D or better) under future conditions before the addition of the
proposed project traffic
CUMULATIVE PLUS PROJECT TRAFFIC PROJECTIONS
The proposed project traffic volumes were then added to the cumulative base traffic projections
to develop the cumulative plus project traffic forecasts The resultant cumulative plus project
morning and afternoon peak hour traffic volumes are illustrated on Figure 9 Based on the
criteria established by the City of Los Angeles and Culver City two of the seven intersections
are projected to operate at acceptable level of service (LOS D or better) under future conditions
after the addition of the proposed project traffic
30n6o L 0'3'7
<1-
Land
mark St
"
641-4-roe,
Oa>.
Ls>
(-LEGEND
Project Site
AM(MID)[PM] Peak Hour Traffic Volumes
(Rounded to the Nearest Five Vehicles)
KAKU ASSOCIATES
NOT TO SCALE
National BI