Legislation Details

File #: HIST-16724    Version: 1 Subject:
Type: Historical Status: Consent Agenda
In control: City Council Meeting Agenda
On agenda: 5/9/2011 Final action: 5/9/2011
Title: JOINT CITY COUNCIL/REDEVELOPMENT AGENCY BOARD AGENDA ITEM: Approval of Preliminary Plans for West Washington Boulevard AIP Phase III.
Attachments: 1. JOINT CITY COUNCIL/REDEVELOPMENT AGENCY BOARD AGEN - JC-1__11-05-09_CDD_JOINT ITEM__AIP Phase III Conceptual Plan - FINAL.docx, 2. JOINT CITY COUNCIL/REDEVELOPMENT AGENCY BOARD AGEN - 11-05-09_ATT_CDD_AIP Phase III - Conceptual Plans.pdf
City of Culver City, California Agenda Item Report Meeting Date: 05/09/11 Item Number: JC-1 JOINT CITY COUNCIL/REDEVELOPMENT AGENCY BOARD AGENDA ITEM: Approval of Preliminary Plans for West Washington Boulevard AIP Phase III. Contact Person/Dept.: Elaine Warner Phone Number: 310.253.5777 Fiscal Impact: Yes [X] No [] General Fund: Yes [] No [X] Public Hearing: [] Action Item: [] Attachments: [X] Commission Action Required: Yes [] No [X] Date: _______________ Public Notification: (E-Mail) Agenda and Meetings – City Council (05/04/11); (E-Mail) Agenda and Meetings – Redevelopment Agency (05/04/11), (USPS) Property Owners Located Within the Proposed District Department Approval: Sol Blumenfeld (05/03/11) Agency General Counsel Approval: Murray Kane (05/04/11) City Attorney Approval: Carol Schwab (by H. Baker) (05/04/11) Chief Financial Officer Approval: Jeff Muir (05/04/11) City Manager/Executive Director Approval: John M. Nachbar (05/04/11) RECOMMENDATION Staff recommends that the City Council and the Redevelopment Agency Board (Agency Board) approve conceptual plans for additional landscaped medians along West Washington Boulevard as part of the Area Improvement Plan – Phase III project. BACKGROUND In December 2007, the Culver City Redevelopment Agency (Redevelopment Agency) approved a multi-phased Area Improvement Plan (AIP) along West Washington Boulevard to improve the physical and economic quality of the area (Attachment 1). A key component of this AIP involves the installation of landscaped medians funded by the Redevelopment Agency. While the Redevelopment Agency has proposed to fund the improvements, it will only do so if the on-going median maintenance is carried out through an assessment district. The Phase I portion of the plan is complete and maintenance funds are now being collected by the associated assessment district. The Phase II assessment district was approved last year and construction is slated to begin in June 2011. City of Culver City, California Agenda Item Report DISCUSSION: The conceptual plans for Phase III include two (2) new medians, totaling 388 linear feet, positioned between Wade Avenue and Boise Avenue along West Washington Boulevard (Attachment 2 and 3). The medians will be located in the center of the right-of-way within existing median striping. The medians will be six feet wide and will be incorporated easily within the street minimizing impacts to traffic flow. The proposed medians will further beautify the commercial area and the planting palette will include drought tolerant Queen Palm trees as the primary species and Burgundy Phormiums, Society Garlic and Blue Oat Grass as the understory planting similar to Phases I and II.Community Development and Public Works Department staff have worked closely with the landscape architect to ensure this configuration and planting palette will not cause any visual blind spots or distractions for vehicular and pedestrian traffic. The understory planting will be maintained at a low level and below sightlines required by California State Law. In addition, two uplights will be positioned near each tree to illuminate them at night and to address median auto safety concerns. In addition, designs for the rehabilitation of the five existing medians located near Wade Avenue were also developed. These designs highlight a “curved” concept that reflects the line of street and utilizes corten steel panels and fiber optic lighting to accentuate planting. The intent of the design is to rescale the street and open the area into a more vehicular and pedestrian friendly area. Planting in these medians will include many of the specimens in the new medians as well as enhanced planting of Aloe, Cookianum Phormiums, Senecio and Echeveria. The proposed plan includes the removal of the existing palms and replanting broad spreading trees (Attachment 4). Special lighting is also proposed in these medians for aesthetic and safety purposes. A community meeting to discuss these plans was held on April 28 th at Culver West Alexander Park. Estimated maintenance costs for the medians would be funded by a proposed assessment district of adjacent property owners. The annual cost is currently estimated at $21,000 and would include maintenance and administrative fees for the two new medians and three of the rehabilitated medians. The remaining two rehabilitated medians will be maintained within the Phase I Assessment District. Assessments are contemplated to be levied on commercial linear feet and building square foot area. A majority vote weighted by proposed assessment amount is required to form the Assessment District. A timeline and details regarding that process is outlined in Attachment 5. As previously noted, construction documents for this project will not be prepared until the assessment district had been formed. If the conceptual plans are approved, an Engineer’s Report will be prepared, per the Resolution of Initiation adopted in September 2010, and brought back in early June. City of Culver City, California Agenda Item Report FISCAL ANALYSIS: There is currently fundingallocated in tax exempt bond funds for the construction of the two new medians and rehabilitation of the five existing medians. ATTACHMENTS: 1.West Washington AIP Boundaries 2. Phase III Area Improvement Plan Boundaries 3. New Median Conceptual Plans 4. Existing Median Rehabilitation Conceptual Plans 5. Assessment District Formation Timeline 6. Estimated Construction Budget MOTIONS: That the City Council and Agency Board: Approve the preliminary plans for the West Washington AIP Phase III. MEETING DATE: 05.09.11 AGENDA ITEM: JOINT CITY COUNCIL/REDEVELOPMENT AGENCY BOARD AGENDA ITEM: Approval of Preliminary Plans for West Washington Boulevard AIP Phase III and Direct Staff to Prepare an Engineer’s Report for West Washington Assessment District No. 3. ATTACHMENTS Pages 1. West Washington AIP Boundaries 1 2. Phase III Area Improvement Plan Boundaries 2 3. New Median Conceptual Plans 3 4. Existing Median Rehabilitation Conceptual Plans 4-5 5. Assessment District Formation Timeline 6 6. Estimated Construction Budget 7-8 Area Improvement Plan West Washington REDEVELOPMENT AGENCY [ 00.08 0.16 0.04 Miles GIS PROGRAM AUGUST 04, 2009 Phase|10101010|City Boundary Demonstration Areas Baldwin Project Washington Centinela ATTACHMENT 1 1AIP PHASE III BOUNDARIES ATTACHMENT 2 2PHASE III NEW MEDIANS (between Mildred Avenue and Wade Street) ATTACHMENT 3 3PHASE III CONCEPTUAL PLANS ATTACHMENT 4 4PHASE III RENDERING ATTACHMENT 4 5 Page 1 of 1 CITY OF CULVER CITY BENEFIT ASSESSMENT DISTRICT WEST WASHINGTON BOULEVARD NO. 3 FORMATION TIMELINE (Council Meets 2 nd & 4 th Monday) 8/30/2010 NBS prepares and delivers Resolution Initiating Proceedings 9/13/2010 Initiation Meeting – City Council initiates the formation of the Assessment District and orders NBS to prepare the Engineer’s Report 4/28/2011 Community Outreach Meeting with property owners to discuss conceptual plans and proposed maintenance City consideration and selection of plans City Staff provides draft budget to NBS for incorporation into Preliminary Report NBS incorporates draft budget into Report and begins preparation of Preliminary Engineer’s Report and Resolution of Intent NBS provides draft Engineer’s Report, Notice and Ballot to City for review and comment City provides feedback on Report, Notice and Ballot. NBS incorporates any changes NBS prepares and delivers the Preliminary Engineer’s Report, Notice, Ballot and Resolution of Intent June 6, 2011 Intent Meeting – City Council reviews and considers the Report and Resolution, which also sets the time and place of the Public Hearing June 10, 2011 NBS prepares and mails Notice and Ballot to property owners within the proposed District NBS prepares and delivers Resolutions: Ordering the Levy and Collection of Assessments, Declaring Results of the Ballot Tabulation 7/25/2011 Public Hearing – City Council holds Public Hearing, allowing interested persons to “hear and be heard”, considers Resolutions: Ordering the Levy and Collection of Assessments, Declaring Results of the Ballot Tabulation NBS sends diagrams for recordation at County NBS provides City with Final Engineer’s Reports, including certified diagrams 8/10/2011 NBS submits assessments to the County for placement on the 2011/12 tax roll ATTACHMENT 5 6CLIENT CULVER CITY COMMUNITY DEVELOPMENT PROJECT DESCRIPTION PROJECT NO. AIP PHASE III LOCATION WASHINGTON BLVD. WASHINGTON PLACE INTERSECTION -EXISTING MEDIANS LANDSCAPE ARCHITECT DATE OF ESTIMATE LAND IMAGES 4/21/11 ESTIMATED PROBABLE CONSTRUCTION COSTS FOR WORK DESCRIBED ON THE SCHEMATIC DRAWINGS EXISTING CENTER MEDIANS AND NEW MEDIANS ALONG WASHINGTON BOULEVARD SITE PREPARATION estimate assumes 6" existing curb and gutter to remain ITEM DESCRIPTION QUANTITY UNIT UNIT COST ITEM TOTAL Contractor mobilization 1 allow 10,000.00 10,000.00 $ Traffic control 1 allow 10,000.00 10,000.00 $ SWPPP 1 allow 1,000.00 1,000.00 $ Remove concrete apron inside existing curbs (center meds.) 1,550 sf 4.00 6,200.00 $ Sawcut and remove concrete paving and base(Wash meds.) 3,100 sf 4.00 12,400.00 $ Soil overexcavation and export 520 cy 30.00 15,600.00 $ Soil compaction and percolation testing 1 allow 10,000.00 10,000.00 $ Agricultural Soil testing 1 allow 2,500.00 2,500.00 $ Remove shrubs and ground cover 6,000 sf 2.00 12,000.00 $ Grind-off existing traffic striping 1 allow 7,500.00 7,500.00 $ Remove and transplant palm trees (direct plant-2.6 miles) 14 ea 4,000.00 56,000.00 $ SITE PREPARATION SUBTOTAL 143,200.00 $ SITE WORK CONSTRUCTION ITEM DESCRIPTION QUANTITY UNIT UNIT COST ITEM TOTAL Construction staking 1 allow 2,500.00 2,500.00 $ Concrete curb and gutter (wash meds.) 800 lf 25.00 20,000.00 $ Concrete apron and curb repair 800 sf 10.00 8,000.00 $ Compacted aggregate base 55 cy 40.00 2,200.00 $ Curved steel planter edging (18" x 8' x 3/4" sections foundry curved) 40 ea 1,200.00 48,000.00 $ 1" Steel anchors with 2' dia. footings 50 ea 500.00 25,000.00 $ Fiber optic strip lights and fastener at planter edging 320 lf 60.00 19,200.00 $ Fiber optic illuminators and enclosures (1 per island) 4 ea 5,000.00 20,000.00 $ Palm tree uplights with concrete bases (2/tree) 66 ea 1,800.00 118,800.00 $ Electrical service: lighting conduit, wiring, cutting, trenching and patching, pull boxes 1 allow 40,000.00 40,000.00 $ Myers cabinet 1 ea 3,335.00 3,335.00 $ PCC pavement repair for electric / utilities / irrigation 1 allow 15,000.00 15,000.00 $ Street striping and graphics 1 allow 5,000.00 5,000.00 $ CONSTRUCTION SUBTOTAL 304,535.00 $ LANDSCAPE-PLANTING AND IRRIGATION ITEM DESCRIPTION QUANTITY UNIT UNIT COST ITEM TOTAL Import soil-place and fine grade -18" 225 cy 50.00 11,250.00 $ Import soil for center island mounding -18" 30 cy 40.00 1,200.00 $ 12" x 6' Augered drain sumps (2 per tree) 72 ea 100.00 7,200.00 $ 60" box specimen trees 3 ea 4,000.00 12,000.00 $ 14' Brown trunk queen palms 8 ea 750.00 6,000.00 $ Shrubs and ground cover 7,800 sf 5.00 39,000.00 $ Washington Phase III Land Images Page 1 of 2 Schematic Estimate V1.2 April 21, 2011 ATTACHMENT 6 72" Bark mulch / ground cover 7,800 sf 0.75 5,850.00 $ Irrigation meter, backflow preventer, controller 1 allow 20,000.00 20,000.00 $ Irrigation systems 7,800 sf 5.00 39,000.00 $ Clean up and 90-day maintenance 1 allow 3,000.00 3,000.00 $ LANDSCAPE- PLANTING AND IRRIGATION SUBTOTAL 62,000.00 $ SITE PREPARATION 143,200.00 $ CONSTRUCTION 304,535.00 $ PLANTING AND IRRIGATION 62,000.00 $ SUBTOTAL 509,735.00 $ 30% Prorate 152,920.50 $ TOTAL 662,655.50 Washington Phase III Land Images Page 2 of 2 Schematic Estimate V1.2 April 21, 2011 ATTACHMENT 6|1013|